Laserfiche WebLink
ANOKA COUNTY-ELAINE AIRPORT <br />1985 Pro ects <br />Overlay Runways, Taxiways, Aprons,.etc. - 20$0,000 <br />Periodically it is necessary to apply a bituminous overlay on the run- <br />ways, taxiways, etc, to restore the surfaces to a smooth even con- <br />dition and improve braking conditions. Previously approved by the <br />Commission, <br />Landing Aids - $20,000 <br />Appropriate navigational aide for the airport are being analyzed in <br />order to provide increased safety and operational benefits. <br />Previously approved by the Cw-ru-iission. <br />1986 Projects <br />Building Area Development - $800,000 <br />All available hangar construction area has been leased. It is pro- <br />posed an additional area be developed, consistent with the Master Plan <br />recommendations. An Environmental Impact Statement covering this <br />project is currently underway. Previously approved by the Cmuission. <br />Master Plan 1B Deve1paneat - 51,900.000 <br />This project will move the existing nazth/scurh runway and taxiway <br />system approximately 950' to the north. Also included in the project <br />AU be the extension of the east/west runway to 40001. An <br />Enn7uyr anal Impat r Statement covering this project is currently <br />underway. Previously approved by the Crmn;se;nn, <br />LAKE ELMO AIRPORT <br />T4_855 erects <br />Overlay Runways, Taxiways, Aprons, etc. - $250,000 <br />Periodically, it is necessary to apply a bituminous overlay on the <br />runways, taxiways, etc. to restore the surfaces to a smooth even con- <br />diton and improve braking conditions. Previously approved by the <br />Co®ission. <br />