My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 1985/04/22
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
1980-1989
>
1985
>
Agenda Packets - 1985/04/22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2025 8:50:20 AM
Creation date
3/24/2025 8:50:20 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
4/22/1985
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
V. APPLICATION <br />A. The coating resins should he applied immediately after the sandblasting operation <br />is completed, but application must begin no later than 16 hours following and <br />before, any visible rusting occurs. If visible rusting is apparent, additional surface <br />preparation will be required up to and including resandblasting, at the discretion <br />of the engineer supervising the work. <br />B. The final spray coat is to average 15o mils thick and in no case, less than 125 <br />mils, and is to be free of runs, pin holes or other defects. <br />C. The applied resin is to be allowed to cure for the time period and at the <br />temperature specified by Armor Shield, before product is reintroduced into the <br />tank. <br />V1. INSPECTION <br />A. The Contractor is to notify owner of the Scheduled starting time for the <br />application process so that, if desired, an inspection of fhe sandblasted surface can <br />be made. <br />B. The Contractor is to notify owner of the time scheduled for closing the tank, so <br />that an inspecton of the coated surface can be made. <br />VIL CLOSING <br />A. Where no hatch cover exists and a manhole has been cut out, the tank is to be <br />sealed by the following method: <br />using an oversized cover plate, having the same thickness as the tank, and <br />overlapping the hole 2' on each side, bolt the plate securely over the opening <br />through pre -drilled holes on 4" centers. Trowel material is to be applied around <br />the opening to provide a seat for the cover plate. The cover plate is to be pre- <br />formed to the curve of the tank and fit snugly to the tank surface at the plate <br />edge. The plate and surrounding tank surfaces are to be sandblasted, the plate <br />edge and bolts filled and rounded as in 4. E., and the entire area coated with <br />trowel material or spray coat. <br />B. Allow the plate coating to cure. Fill the excavalon. All rubbish and debris shall <br />be removed from the site and the work area swept clean. <br />
The URL can be used to link to this page
Your browser does not support the video tag.