Laserfiche WebLink
Schedules Prlcee <br />unit prices will thelifeothenly for <br />his <br />The Bidder further agrees that the following the termination of this <br />additions to, deletions from or extra work authorized during <br />contract and for a period of thirty (30) days following <br />contract for any reason, all supervision, labor, tools, <br />ment, fringes, taxes, insurancinclude complete installation, e, profit, etc., <br />Unit prices shell <br />materials, supplies, accessories, e1cui P <br />in accordance with all contract Specifications• UNiT UNITE <br />ITEM <br />C.Y. <br />Common Excavation (2105) <br />C.Y.i0 <br />Rock Excavation (2105) <br />C.Y. <br />Granular Borrow (LV) <br />$ S,op <br />C.Y. <br />Common Borrow (LV) <br />L_S�11 <br />C.Y. <br />Topsoil Borrow (LV) <br />C.Y. <br />5— sue' <br />Salvaged Aggregate <br />L.F. <br />Erosion Control <br />s G� <br />Fine grading, fertilizing <br />S.Y. <br />and sodding <br />f�� <br />Fine grading, tertlllzing <br />S.Y. <br />and sodding <br />b'x6"xloll precast concrete <br />Ea.�� <br />curb w/anchore <br />L.F. <br />5 <br />15" RCP sewer, Class 5 <br />S l <br />Ea. <br />15" RC apron <br />L.F. <br />�°—' <br />121, rMP culvert <br />12" CM apron <br />L.F. <br />24" CMP culvert <br />s a <br />Ea. <br />24" CM apron <br />S.Y. <br />$ o <br />4" Ag-lime trail (Including grading) <br />S.Y. <br />b" cg-lime trot! <br />S.Y. <br />5�- <br />4„ ag.Iima surlece (baseball field) <br />7 <br />