Laserfiche WebLink
26.08 <br />The report shall have attached a certificate by the <br />registered engineer or other person in charge that the work <br />was done according to the plans and specifications, or, if <br />there were any deviations from them an itemized statement of <br />these deviations. <br />subdivision 4. Alternate Procedure On Street Improve- <br />ments. As to any improvement or impiuvaxiaots consisting of <br />grading, graveling, Or bituminous surfacing of streets and <br />alleys, the Council may proceed in the manner provided in <br />this Code, except that it may <br />(1) order the work done by day labor, regardless of <br />the estimated cost Of such improvement or improve- <br />ments, and <br />(2) use municipal equipment or hire equipment and <br />purchase materials for all such improvements to e <br />done by day labor in any twelve-month period by <br />advertising once therefor, such advertisement to <br />call for bids for the furnishing of equipment, if <br />the City does not use its own equipment, and for <br />materials at unit prices based on the quantities <br />which the Council estimatus will be required, <br />(3) contract at one time on a unit -price basis for part <br />Ot all of the wtreot improvements to he constructed <br />by the municipality during the current year, <br />including improvements which may thereafter be <br />ordered constructed. <br />subdivision 5. Cooperation with State or Local <br />Government. When an improvement is made under a Inoperative <br />agreement with this state or another political subdi,isiun <br />by the terms of which the state or other subdivision is to <br />construct the improvement, it sha!1 not be necessary to <br />comply with subdivisions 1 and 2. <br />Subdivision 6. Percentage Payment on Engineer's <br />Estimate. In case the contractor properly performs the <br />work, the Council shall, from month to month hefore <br />completion of the work, pay him not to exceed 98 95 <br />percent of the amount already earned under the crntract, <br />upon the estimate Of the engineer or other competent person <br />setected by the Council, and the contract shall so provide, <br />and shall further agree that when the work is 90 95 percent <br />or iixira completed upon the recommendation of the engineer <br />such portions of the retained price shall be released as the <br />Council determines are not required to by retained to <br />protect the r_ity's interest in satisfactory completion of <br />the contract. <br />