Laserfiche WebLink
-4- <br />2. PROPOSAL REQUIREMENTS (continued) <br />g. Specifications <br />Unless otherwise stated by the bidder, the proposal <br />wiil he considered as being in strict accordance <br />with the Specifications outlined in the hid <br />document. <br />h. Opening of Bids <br />At the time and on the date specified in the adver- <br />tisement for receipt of bids, all bids will be <br />opened and publicly read. <br />i. Forms to be included with proposal: <br />(1) Non -Collusion Affidavit <br />(2) Quotation Sheet <br />(3) Work History Statement <br />j. If you have any questions regarding the Specifica- <br />tions or bidding process, please. contact Rita <br />Docken, Solid Waste Coordinator, 784-3055. t <br />3. GENFRAL CONDITIONS <br />a. Qualifications of Bidders <br />No award will be made to any bidder who cannot give <br />satisfactory assurance as to his ability to carry <br />out the contract both from his financial rating and <br />by reason of his previous experience and performance <br />of work of the nature contemplated in the contract. <br />The bidder may be required to submit his record of <br />work of a similar nature to that proposed under <br />these specificatons. unfamiliarity with the type of <br />work may be sufficient cause for rejection of bids. <br />h. Performance Bond <br />The successful bidder shall, before entering into a <br />contract, deposit and maintain with the City during <br />the two year term of the contract a good and <br />sufficient corporate surety bond satisfactory to the <br />City Council in the principal sum of $100,000. Such <br />bond is to be conditioned upon the faithful <br />performance of the contract. If no surety bond is <br />filed as herein provided, the bidder's bid bond <br />^.al'. tie forfeited to the Citv immediately. <br />