Laserfiche WebLink
Memo to Barry Bauer Page 3 <br />There are three major reasons for relocating che new courts to the <br />Northweat corner of the s<hool proper[y: <br />1. The existing eourts were laid out incorrec[ly and do not <br />have a fawra6le relationship wi[h [he sun. <br />2. The nea tennia court loca[ian would allov for be[ter community <br />inwlvement crith increased parking and visibility. <br />3. The new locatiort will decrease vandalism on [he echool site. <br />The nev tenais cour[s aite will consist of four "championship" courta <br />with fencing, color coating, lighting aad bang boarda for echaol aad <br />overflow use. <br />The total coat for the tennia court installations ia projected at $50,000.00. <br />The total cost would be divided between the City and School Dis[rict vith <br />the Ciry's ahare coming from a matching granc. <br />A cost breakdown for 1979 is as follws: <br />Asphalt <br />Lighting <br />Feacing <br />Color Coaring, ne[ <br />posta, etc. <br />Total <br />20,000.00 <br />15,000.00 <br />10,000.00 <br />5,000.00 <br />550,000.00 <br />1980 - Phase three of [he Edgewood pzoject would consist of the development <br />of a four lane -y mile track around the football field. <br />There preaently are only tvo tracks in the entire achool district, both <br />of vhich axe located at the Eigh School site. Aftez apeaking with achool <br />district pereonnel, it appears that track and field is one of the largest <br />and faatest groving after school programs offered in Che achool dietsict. <br />The addition of a track at Hdgewood wuld be a great asaet and would apen <br />up exteneive program poasibilities bo[h at the day school and comnunity level. <br />The coat of the track would be approximately 510,000.00. <br />The other major project for 1960 would be the upgrading and replacement of <br />all miacellaneous equipment: <br />Resurface old tennia courta <br />Purchaae bleachere and playera <br />benches for all fields <br />Develop a trailway system <br />throughou[ che si[e <br />Totel <br />S 7,000.00 <br />S 5,000.00 <br />S 3,000.00 <br />15,000.00