My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/06/1981 Packet
MoundsView
>
Commissions
>
Parks, Recreation & Forestry Commission
>
Agenda Packets
>
1980-1989
>
1981
>
01/06/1981 Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 2:15:50 PM
Creation date
3/31/2025 2:10:07 PM
Metadata
Fields
Template:
MV Parks, Recreation & Forestry Commission
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
189
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Amono the item, which will he; cun:ielcred In Ihr ovrinll <br />cancept. plan f` r Silver lake are - <br />Final Master Plan <br />- Parking layout <br />- vai.hway/trai 1 devclnl+ment <br />— lr'ater hod ien <br />— Tf,t lot/use area:; <br />- Micr'oclimatic• modificalArins <br />- Grading and seirfave- drainage <br />- Playfield deve'lohment <br />- Planting plan and plarl.inalertal idont.ificat.ion <br />- Maint.enunco e:unsider'at ton <br />- Construction pfutninj! plan I;S phiulr•r;) <br />"s• <br />— Site f1Ir'ni!;F1lnl,-. <br />- Signage and :,ar-Paving matr'riain <br />- Park tilclter drr!rif;rt <br />`ft <br />— 1'i t'n1t: at'elt:i <br />— Swimminpl beach <br />— <br />— Pr'el imirnrry CIISI delta <br />Phase One <br />I+relleewinll urnerrtl upprnval tit' the Master I'lan Scheme <br />— -' Final Design Scheme <br />cicve:lop a I'miti and more detailed layout prior to the <br />11repurut.ifill of conntr•uction document.! and specifications <br />of pins:! one improvement.n. Specific elements of the <br />plan to he addrerlaed include: <br />I. two baKeball/suftbrlll field:: <br />'s. linder•ground irrigntion qy-item <br />3. Appr'oximutely Un cur parking lot <br />A. Park act'eay road <br />5e. Ini1.ial riit! grading <br />6. Turf enLahl i aliment <br />.. TASK 3 <br />Co"::;Tlttj( I'IUN o0CUMI:NTS PREPARATION <br />March 16 - Apr•i 1 3 <br />' <br />It. i;: important that the Cil.y of Mounds View feel <br />ernrfor•Lahle with the total scope of the work performed <br />Ili this point. in the design process, and that it is <br />able to support the product. We feel that the team <br />ahprnarfl, open reviews and acceptance of relevant <br />input will result in a quality, innovative and feasible <br />de!:il;n solution. <br />with approval of final design and the City's decision <br />Lo proceed, Design Consortium will prepare construction <br />dUCLIM.-nt.s, details, and specifications relative to <br />Items l — 6 out.lined above as Phase One elements. <br />13 <br />IIF.tiI{:N 11MM1nU M I.NC APA!I1MA,,niRr, 1.ANIN APF AWtNrtFU71'11BIi PLANNING pF:SN:N IIII2 MAIUIt1E1' T AYF. IIINNSAF41LIS MN r4403 4112 341.Wn <br />
The URL can be used to link to this page
Your browser does not support the video tag.