Laserfiche WebLink
es>� <br />of water until a test well is drilled. A 6" diameter test well <br />could cost $30,000.00 to $40,000.00. Installatinn of the <br />pntassium permanganate chemical feed system on a temporary basis <br />is better than tryinq to install a new well. <br />RECOMMENDATION: I recommend installing a Potassium permanganate <br />chemical feed system per this memo. I also recommend continuing <br />Pilot study work with the ozone equipment once the potassium <br />permanganate chemical feed system is installed. Funding for <br />installing the Potassium permanganate chemical feed system shall <br />come from hater System Capital Improvement and Maintenance Account <br />No. 700-122-4123. There is sufficient money in the 1986 Budget <br />for this project. Funding for the ozone pilot study was approved <br />on June 24, 1985, in the amount of $5,800.00. we are under budget <br />by approximately $2,000.00 on this project. I propose utilizinq <br />the remaining portion of the budget to continue the ozone pilot <br />study once the potassium permanganate chemical feed equipment is <br />installed. <br />SWr/bac <br />Attachment <br />