My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 1986/07/07
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
1980-1989
>
1986
>
Agenda Packets - 1986/07/07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2025 1:55:19 PM
Creation date
4/1/2025 1:55:19 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
7/7/1986
Description
Work / Executive Session
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Larger cities make sure thAt the down stream pipes are <br />adequate to handle the flow from any proposed pipes <br />prior to installing the proposed pipes. As long as the <br />downstream pipes have adequate Capacity, the proposed <br />pipes can be installed. <br />Smaller improvement projects could he implemented <br />starting at the most downstream point and subsequent <br />projects could he constructed by working upstream. This <br />type of program must he hased on A comprehensive storm <br />sewer improvement plan for the drainage basin. <br />5. Nork Re uest No. 5 - Mr. and Mrs. Reinhardt, 2741 Ardan <br />Avenue, at the last Council meeting, requested that the <br />City remove the existing concrete pipe sleeves from the <br />top of the storm sewer inlet. <br />will removing the existing concrete pipe reduce tte <br />quantity of ponded water? <br />TV. SUMMARY <br />1. Staff requests direction and policy on storm sewer <br />improvement requests and petitions. C <br />2. What policy should the City have for improvements to <br />storm sewers when the down stream pipes may be <br />inadequate? <br />What policy should the City have for paying for <br />requested or petitioned storm sewer improvements? <br />4. If a large project to repair all of the storm sewer <br />problems in a drainage district cannot be funded, it <br />may be possible to correct the problems over several <br />years by correcting the downstream problems first. <br />SWT/bac <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.