My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 1986/10/06
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
1980-1989
>
1986
>
Agenda Packets - 1986/10/06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2025 2:35:16 PM
Creation date
4/1/2025 2:35:16 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
10/6/1986
Description
Work Session
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Steve Thatcher Parking Standards Memorandum 9/8/86 Page 4 <br />ASSUMPTIONS <br />Several assumptions have influenced our decisions and conclusions regarding the <br />parking standards. We review them here: <br />1) From the market research done by JLN Development for this project <br />we are anticipating an initial mix in potential tenants as fo►lows! <br />Office/Service: 25% Office, 75% Warehouse <br />Light Industrial: 10% Office, 90% Warehouse <br />2) Based on our experience and theirs in these kinds of developments, <br />we would anticipate that the maximum mix in tenant use at some <br />future date would be: <br />Office/Service: 75% Office, 25% Warehouse <br />Light Industrial: 40% Office, 60% Warehouse <br />3) In order to allow for an even more conservative approach to the <br />project, we have designed the parking to allow for the lower figure at <br />first, but an overlay design has been prepared which can be <br />implemented to convert the back truck loading areas to parking as <br />Ak <br />needed for changes in building use. This ultimate design assumes the wr <br />following: <br />Of 100% Office, NO Warehouse <br />Light Industrial: 50% Office, 50% Warehouse <br />4) In addition to the conservative assumptions above we have added a <br />10% margin of safety to the office figure, bringing the 3.211000 noted <br />above to 3.5/1000, which Is our recommendation. This margin will allow <br />for parking inefficiencies, snow storage, and other contingencie9. <br />5) In addition to this, we have been operating thus far on our <br />development plans using gross building area (GBA) as the basis for our <br />parking calculations, since this is the number JLN uses in its tenant <br />leases. Since Mounds View calculates parking on a GLA which is 10% <br />less than GBH, the parking ratios we have shown will increase by more <br />than 10% when converted to GLA. Our final development plan and <br />parking overlay will be refined to take this into account. <br />The table on the following page compares the figures arrived at for <br />Office/Service and Light Industrial buildings under the various assumptions. <br />
The URL can be used to link to this page
Your browser does not support the video tag.