My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 1988/11/14
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
1980-1989
>
1988
>
Agenda Packets - 1988/11/14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2025 10:53:24 AM
Creation date
4/9/2025 10:53:23 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
11/14/1988
Description
Regular Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
0 <br />existing water quality parameters within wetland <br />Where possible, the above -listed data will be collected <br />from the City, the watershed district, the engineers who <br />designed the wetland, and from the Minnesota DNR. Water <br />quality parameters will be obtained by submitting samples to <br />n certified laboratory. <br />Task 2. Water uality Analysis <br />Ambient water quality data will be studied to estimate <br />the present nutrient pollution level in Wetland 893 and to <br />determine its existing trophic .level. In addition to data <br />available from the Minnesota DNR and PCA, water samples will <br />be taken from the wetland during critical times of the year, <br />These time periods will include the early spring when the <br />first nutrient surges enter the wetland, mid -summer and tl.: <br />late summer when hot weather and low water magnify ti,e <br />effects of nutrient pollution. A total of three (3) samples <br />will be taken for total phosphorus, total nitrogen, <br />® chlorophyll and algal identification. On each of the three <br />dates, the laze will be sampled et three locations. <br />Anticipated future ebanges in water quality will be <br />estimated by reviewin,• the City's comprehensive land use <br />plan and the development potential of the portion of the <br />wetland's watershed which remains undeveloped. Using <br />standard nutrient lording models, projected nutrient loads <br />from future development will be added to present loads to <br />estimate future conditions. Again. a determination trill be <br />made whether the e.nticipated nutrient level will exceed any <br />thresholds at which perceptible changes in trophic level <br />would occur. <br />A number of water quality control measures will bz <br />investigated, either to maintain or improve upon existing <br />conditions. These measures potentially include: <br />1. Limiting the amount of new stormwater to be directed to <br />the wetland in the future. <br />2. Provision of pre-treatment of stormwater inflows through <br />use of detention ponds. <br />® 3. Limiting the future generation of nutrients within the <br />wetland's watershed through improved street sweeping <br />techniques, reduced lawn fertilization, and/or.requiring oii- <br />site stormwater treatment for new developments draining <br />toward the wetland. <br />
The URL can be used to link to this page
Your browser does not support the video tag.