Laserfiche WebLink
WHEREAS, the County, City and State will participate in <br />the cost, maintenance and operation of the interconnect and the <br />nea and revised traffic control signals with street lights and <br />signing as hereafter set forth; <br />NOW, THEREFORE, IT IS ACREEO AS FOLLOWS: <br />1. The State stall prepare the necessary plan, <br />specifications and proposal and shall perform the engineering and <br />inspection required to complete the items of work hereinafter set <br />forth. Such work as described immediately above shall constitute <br />"Engineering and Inspection" and 'shall be ao referred to <br />hereinafter. <br />2. The contract cost of the work, or if the work is <br />01 not contracted, the cost of all labor, materials, and equipment <br />rental required to ccmple:e the work, except the cost of <br />providing the power supply to the service pole or pad, shall <br />constitute the actual "Construction Cost" and shall be so <br />referred to hereinafter. <br />3. The State with its own forces and equipment or by <br />contract shall perform the traffic control signal work provided <br />for under the State Project No. 6204-42 and State Aid Project <br />No.`s 62-603-07, '62-605-03, 62-644-14, 62-645-09, 6"-677-14, <br />146-228-04 and 146-234-03 with the Construction Costs shared as <br />follows: <br />a. Trunk Highway No. 10 at County State Aid <br />Highway No. 44 (Silver Lake Road) - County <br />65362 <br />-2- <br />