Laserfiche WebLink
0 <br />C <br />d. Trunk Highway No. 10 at County State Aid <br />Highway No. 5 (County Road H-2) - County Road <br />H-2. System "D". S.A.P. 62-605-03 and <br />146-234-03. Revise the existing traffic <br />control signal with street, lights. Estimated <br />Construction Cost is $40,000.00 which <br />includes State furnished materials. <br />Anticipated State's share is 50 percent. <br />County's share is 25 percent. City's share <br />is 25 percent. <br />e. Trunk Highway No. 10 at County State Aid <br />Highway No. 77 (County Road H) - County Road <br />H. System "F". S.A.P. 62-677-14. Revise <br />the existing traffic control signal with <br />street lights. Estimated Construction Cost <br />is $32,000.00 which includes State furnished <br />materials. Anticipated State's share is 75 <br />percent. County's share is 25 percent. <br />f. Trunk Hignway No. 10 from County State Aid <br />Highway No. 44 (Silver Lake Road) County <br />Road 126 (Redoak Drive) to County State Aid <br />Highway No. 77 (County Road H) - County Road <br />H. S.A.P. 62-603-07, 62-605-03, 62-644-14, <br />52-645-09; 62-677-14, 146-228-0' and <br />146-234-03. Install interconnect. Estimated <br />65362 <br />-4- <br />