Laserfiche WebLink
CITY ENTRY - COUNTY ROAD I TRIANGLE AND BOULEVARD <br />Material costs include: <br />7 evergreens 6 feet - $110.00/tree .. <br />5 shade trees 2 inch diameter - $110.00/tree .••.••• <br />12 large shrubs 3 feet - <br />$15.00/unit ........ <br />2 decorative sign posts - $150.00/poet ........••••••••. <br />1 entry sign (large metallic, reflective) <br />Miscellaneous (fabric, timbers, etc.) .....I•.. <br />25 4-6 foot evergreens (Co. Rd. I boulevard)...,, <br />Community involvement: <br />$ 770.00 <br />550.00 <br />180.00 <br />300.00 <br />200.00 <br />200.00 <br />1,250.CO <br />TOTAL ...... $3,450.00 <br />100 school childreniPTA/teachers <br />'00 hours x $5.00 ............................ $ 500.00 <br />Staff supervision (1) <br />16 hours x $12.00 ............................ 192.00 <br />Staff labor <br />16 hours x 2 staff x $12.00 .................. <br />364.p0 <br />TOTAL ...... $1,076.00 <br />Equipment rate: <br />Chainsaw $5.00 x 8 hours .......... <br />Tree spade $25.00 x 16 hours ..................... 400.00 <br />TOTAL $ 440.00 <br />GRAND TOTAL ......... $4,966.00 <br />CITY MATCH .......... $3,724.50 <br />CELEBRATE MN. MATCH.. $1,241.50 <br />CITY'S HARD DOLLAR <br />CONTRIBUTION ...... $2,20a.50 <br />CELEBRATION IN 1990 <br />"Festival in the Park" Children'6 Parade, past the triangle. The children's <br />parade would begin at Oakwood Park, proceed along Quincy past the triangle <br />across County Road I continuing o❑ Quincy to Bronson to City Hall. September 10 or 17, 1989. t <br />St. Paul Water Utility has been notified about the possibility of this <br />project. There does not seem to be ary problems interferring with their <br />easement. <br />