My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 1989/01/09
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
1980-1989
>
1989
>
Agenda Packets - 1989/01/09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2025 4:13:08 PM
Creation date
4/15/2025 4:12:27 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
1/9/1989
Description
Regular Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
c3. Whenever the City or a resident notifies the <br />Contractor of locations which have not received <br />scheduled service, the Contractor is required to <br />service such locations by 7:00 p.m. the following <br />day. penalty for not servicing shall be $2.00 <br />per household. <br />c4. Recyclable materials shall be prepared as <br />follows: <br />Newsprint and non -glossy paper: placed in paper <br />bags or cardboard boxes, tied in bundles, or <br />other reuseable containers. <br />Cardboard: flattened and placed in paper bags or <br />tied in bundles no larger than three feet in <br />length, width or depth. <br />c5. Containers in which recyclable materials have <br />been stored shall be placed on the curbside in <br />front of the residents' property by 7:00 a.m. on <br />the scheduled day of collection. <br />c6. All recyclable materials placed for collection <br />shall be owned by and be the responsibility of <br />the occupants of residential property until they <br />are handled by the Contractor. Upon collection <br />of the containers and recyclable materials by the <br />Contractor, the recyclable materials become the <br />11, property and responsibility of the Contractor. <br />2 <br />c7. Recyclable materials deemed unacceptable by the <br />Contractor according to the preparation <br />procedures in subsection c4 shall be collected on <br />the first occurrence by the Contractor. Each <br />time materials are incorrectly prepared, the <br />Contractor shall leave at the residence written <br />notice forms, which are provided by the City, <br />that explain why materials were not collected. <br />The address and the reason why materials were not <br />collected shall be reported to the City the <br />following day so that the City can notify the <br />resident of the proper procedure. Subsequent <br />instances of unacceptable recyclable materials <br />may be rejected; however, this shall be reported <br />to the City. <br />c8. The Contractor shall not landfill, incinerate or <br />make fuel pellets out of the recyclable <br />materials. <br />- 3 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.