My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 1989/04/10
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
1980-1989
>
1989
>
Agenda Packets - 1989/04/10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2025 2:42:32 PM
Creation date
4/16/2025 2:42:32 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
4/10/1989
Description
Regular Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
04i06/89 12:06 <br />6Y/LL/Ams P/PE LIKE commmr:J <br />January 20, 1989 <br />Mr. David macmillan <br />Assistant County Attorney <br />Office of the County Attorney <br />Ramsey County <br />Suite 400 <br />350 St. Peter Street <br />St. Paul, minre.sota 55102 <br />RE: Long Lake Road, Ramsey County <br />Tract 8579 - 13:193 <br />Dear tor. tlacMillan: <br />ect <br />our Project Enginee , hasnneth revir.'sdlehArsof�vovember 1ement of 7 which <br />scope outlined in <br />was transm.ittec to me ty counsel cn Sovembe J.30dcirge road ring <br />bed <br />of the road elV'aticn and the necessity <br />preparation wcrk to an elevatior. :our .`eetW lliamselow "by lowering <br />road surface would typically be our <br />b y judgment in this <br />the pipeline. However, our p cwe : would not <br />situatior. leads us to believe that such <br />exist9 g utilities <br />be possible because of physical con_l'ct.. <br />and the prpccsed sto::s sewer systems. 'therefore, for planning <br />purposes Ramsey County should presume that wi.11iar.,s Pipe Line <br />will reconstruct tFe 3" pipeline witsin the road right <br />Company <br />of Long ❑sing new materials at locations <br />Y LLake Goad, <br />that are mutually agreed upon by our engineers. It is my <br />relocated position and elevation o <br />understanding tie exact <br />the pioelina will not be determined untilou' oE9cineers.7e It review <br />of all _.,cinee:ing factors is made by receding <br />our desire to construct this pipeline i.. diately p <br />your road work on each segment of the Long Lake Road Improvement <br />project. The ex`sting pipeline will be removed from the roadway <br />as each segment of new pipeline :s in operation. <br />eif the final engineering drawings would demonstrate <br />Howev_.. , is <br />that a total reservesrthearighttto dotsomethingyelse based <br />Pine Line Companypang <br />on its best engineering judgaent. <br />EXHIBIT A <br />
The URL can be used to link to this page
Your browser does not support the video tag.