Laserfiche WebLink
RESOLUTION NO. 2492 <br />PAGE FOUR <br />WHEREAS, it has been determined that the proposed <br />excavation and filling will not cause the total natural flood <br />storage capacity of the wetland to fall below the projected <br />volume that the wetland would hold following a six-inch rainfall <br />in 24 hours over the whole developer wetland drainage district, <br />and <br />WHEREAS, it has been determined that the proposed filling <br />will not cause the total natural phosphorus stripping capacity of <br />the wetland to fall below the phosphorus production of the <br />wetland drainage district for its projected d,nvelopment; and <br />WHEREAS, it has been proposed that all fill used will be <br />free of chemical pollutants and organic waste; and <br />WHEREAS, it has been determined that the proposed filling <br />will be implemented so as to minimize the impact on vegetation; <br />and <br />WnEREAS, it has been determined that the proposed dredging <br />will be located to minimize the impact on vegetation; and <br />WHEREAS, it has been determined that the proposed dredging <br />will not significantly alter the wetland's water flow <br />characteristics; and <br />WHEREAS, it has been recognized that the proposed dredging CD <br />is the minimum required to achieve this development; and <br />WHEREAS, it is recognized that the proposed dredging will <br />not take place in breeding or spawning seasons of wildlife; and <br />WHEREAS, it has been determined that organic waste will <br />not be discharged directly into the wetland; and <br />WHEREAS, it has been determined that the storm water <br />run --off from the proposed development will be substantially free <br />of silt, debris and chemical pollutants and will not disturb <br />veget,*ion; and <br />WHEREAS, it has been determined that the proposed <br />development will not cause storm water run-off from the wetland <br />to take place at a rate which would exceed the natural rate of <br />run-off; and <br />WHEREAS, it has peen determined that the proposed <br />development will not cause the total natural phosphorus stripping <br />capacity of the wetland to fall below the projected phosphorus <br />production from the whole developed wetland watershed; and <br />