My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 1989/06/05
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
1980-1989
>
1989
>
Agenda Packets - 1989/06/05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2025 3:05:13 PM
Creation date
4/16/2025 3:05:13 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
6/5/1989
Description
Work Session
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
RESOLUTION N0. 2492 <br />PAGE SIX <br />WHEREAS, the results from Barr Engineering's review of the <br />development proposal. indicates that the develcpment <br />Proposal is <br />in compliance with the permit requirements; and <br />WHEREAS, the development includes several features which <br />may be considered net, benefits with respect to <br />These benefits include the construction of a <br />the wetland for Public interests. <br />increased d for tducati diversity d recreational use, creation <br />trail within <br />wetland (Type 4 wetland) within rthe iexisting <br />and extension of Woodale Drive to State Highway 10. <br />the City0Of MoundFO---w BE IT RESOLVED that the City Council of <br />ermit <br />requests to perform work withinsthee100tlaot alteration <br />the wetland. foot buffer and within <br />BE IT FURTHER RESOLVED that the City Council a <br />wetland alteration permits to allow for working within a wetland <br />zoning district contingent u approves the <br />upon the following: <br />1) The developer confirm in writing that there will not <br />by any disposal of dredged material within the wetland <br />located at the site. <br />2) The developer submit a plan illustrating the <br />boundaries of the work areas and that these <br />boundaries <br />be the minimum necessary to complete the proposed <br />work. <br />3) The developer place silt fences and hay bales as <br />erosion control measures along all boundaries of the <br />existing wetland and the work area. <br />4) The developer present the City with a m <br />and schedule for the aintenance plan <br />on -site storm water ponds. <br />5) The storm water detention basins shall be constructed <br />prior to general site grading and maintained <br />immediately following completion of the development. <br />S) The limits of construction shall be specified and <br />staked in the wetland zoning district. <br />7) A specific construction schedule shall be specified. <br />Adopted tliis 12th day of June, 1989. <br />ATTEST: <br />(SEAL) Mayor W <br />Clerk -Administrator <br />
The URL can be used to link to this page
Your browser does not support the video tag.