Laserfiche WebLink
Metropolitan Waste Control Commission <br />Mars Park Centre, 230 Fast Ftlth Snot, St. Paul, Mimaom 55101 <br />March 3, 1989 ;�5a7-0 612222-S4. <br />Ms. Rim Herman, City planner <br />City of Mounds View o �f� `" <br />2401 Highway 10 � 2 <br />Mounds View, MN 55112 <br />Dear Ms. Herman: <br />As you may remember, the City of Mounds View issued a conditional <br />use permit to the Metropolitan Waste Control Commission for <br />construction of a 5000 square foot building on MWCC property at 2345 <br />County Road H in Mounds View.. The permission wan per rescluti:n number 2292 adooced on February 22, 1988. It was August 11, 1988 <br />before the conditions of the conditional use permit were recorded on our Certificate of Title. The permit requires completion of all <br />work within one year of the granting of the permit. <br />In March and April of last year we re-evaluated our needs and deter- <br />mined that the interceptor sewer service workers could best be <br />served with new facilities in the proposed building, and that the <br />existing building would then not need remodeling for the emDloyees <br />and could by used as a garage and light maintenance area. <br />Accordingly new plans and specifications were prepared for the 50 , <br />foot by 100 foot metal building. <br />With our present plan the westerly 32 feet of the building will con- <br />tain both women's and men's locker rooms, toile+:s, and showers and <br />also a kitchen area, meeting room and a lead worker's office and <br />storeroom. A fire rated wall will separate this area from the 68 <br />foot long storage and light maintenance area. The plan sheets now <br />number 12 instead of the original 3, and they and the specifications <br />cover additional items such as plumbing, HVAC, partitions, flooring, <br />tile_, sheetrock, insulation, walks, etc. etc. <br />The size and location of the building has not been changed. The <br />appearance of the building has been improved by the addition of <br />casement windows and doors, a sidewalk and crushed rock border along <br />I <br />he south side, and by the addition of a two foot roof overhang all <br />around to provide a neater and lower look. <br />These changes and redesign resulted in our not doing the construc- <br />,tlon last year as Originally plann_d. We are now alnOst ready to <br />advertise for bids, but there is no way that the building ca❑ be <br />comoleted within the time frame of the ?ernit. <br />