Laserfiche WebLink
I <br />t <br />PROJECT NO.: 4-1298 <br />APPL FOR MT.NO.: 3 <br />PROJECT: Mounts V1av/Sysrn DATE: 07/19/69 <br />PAGE. 3 <br />CONTRACT SCHEDULE <br />FORK COMPLETED <br />Q=-ity <br />A=1r, <br />Quantity <br />Ar, nt <br />CONTRACT ITEM <br />UNIT <br />VV PRICE <br />FNO <br />SUBTOTAL STORM SEWER <br />63960.00 <br />742B8.00 <br />ROADWAY S GRADING <br />1 <br />CLEARING <br />ACRE <br />I <br />500.00 <br />26.20 <br />13100.00 <br />26.20 <br />I 13100.00 I <br />2 <br />I GRUBBING <br />ACRE <br />250.00 <br />26.20 <br />6550.00 <br />26.20 <br />6550.00 <br />3 <br />REMGVE BITUMINOUS PAVEMENT <br />I S.Y. <br />1.50 <br />1470.00 <br />2205.00 <br />0.00 <br />I 0.00 <br />4 <br />COMMON EXCAVATION <br />C.Y. <br />1.00 <br />129980.00 <br />1299R0.00 <br />164000.00 <br />I 164000.00 <br />5 <br />SUBGPADE EXCAVATION <br />C.Y. <br />1.00 <br />1700.00 <br />17GO.DO <br />0.00 <br />0.00 <br />SA <br />MAUL NCA RE:YCLEABLE WATE <br />LOAD <br />315.00 <br />0.00 <br />0.00 <br />50.00 <br />15750.00 <br />58 <br />HAUL RECY3.FASLE WASTE <br />LOAD <br />84.00 <br />0.00 <br />0.00 <br />9.00 <br />156.00 <br />56 <br />AEMCNE 6 REPLACE SILT FENCE <br />L.F. <br />1.7n <br />0.00 <br />0.00 <br />300.00 <br />510.00 <br />cn <br />PERMITS G MAIDS <br />P&B <br />312.50 <br />0.00 <br />0.00 <br />1.G0 <br />312.50 <br />6 <br />SELECT OPhNULA.R BOR.RCIR <br />C.Y. <br />4.50 <br />307S.00 <br />17437.50 <br />4785.00 <br />21 SM.50 <br />5% MOO <br />7 <br />SUBGRADE PREPARATICN <br />S.Y. <br />0.30 <br />23850.00 <br />7155.00 <br />0.00 <br />0.00 <br />B <br />CL 5 AGGREGATE BASE <br />C.Y. <br />11.60 <br />1300.00 <br />15080.00 <br />0.00 <br />0.00 <br />9 <br />GRANULAR BORRW <br />C.Y. <br />2.S0 <br />1131,10 <br />1311,01 <br />0.00 <br />0.00 <br />10 <br />CL 5 SFOJLDER MATERIAL <br />TON <br />11.00 <br />I 89.00 <br />979.00 <br />0.00 <br />0.00 <br />11 <br />GEOTEJTTILE FABRIC I <br />S.Y. <br />1.25 <br />1600.00 <br />2000.00 <br />0.00 <br />0.00 <br />' 12 <br />3" BASE COURSE MIXTURE <br />TON I <br />13.05 <br />540.00 <br />7047.00 <br />0.00 <br />0.00 <br />13 <br />1-112 BINDER COURSE <br />TON <br />13.60 <br />270.00 <br />3672.00 <br />0.00 <br />0.00 <br />14 <br />1-1/2 WEAP COURSE MIX <br />TON <br />15.70 <br />270.00 <br />4077.00 <br />0.00 <br />0.00 <br />IS <br />BIT. MAT'L FOR MIXTURE <br />TCN <br />130.00 <br />36.00 <br />4680.D0 <br />0.00 <br />0.00 <br />16 <br />BIT. MAT'L FOR MIXTURE <br />TON <br />130.00 <br />16.00 <br />2080.00 <br />0.00 <br />0.00 <br />17 <br />BIT. RAT'L FOR TACK COAT <br />GAL <br />2.D0 <br />330.00 <br />660.00 <br />0.00 <br />0.00 <br />18 <br />CURB 6 GUTTER 6612 <br />L.F. <br />S.00 <br />670.00 <br />3350.00 <br />0.00 <br />0.00 <br />19 <br />OONCRtTE MEDIAN <br />L.F. <br />12.00 <br />RO.00 <br />960.00 <br />0.00 <br />0.00 <br />SUBTOTAL ROADWAY 3 GRADING <br />__------ _-_ <br />228037.50 <br />------------- <br />222511.00 <br />LANDSCAPING <br />1 <br />DOUGLAS FIR <br />EACH <br />155.00 <br />39.00 <br />6045.00 <br />0.00 <br />0.00 <br />2 <br />COLORADO GREEN SPRUCE <br />EACH <br />150.00 <br />20.00 <br />3000.00 <br />0.00 <br />0.00 <br />