My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 1989/08/28
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
1980-1989
>
1989
>
Agenda Packets - 1989/08/28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2025 11:09:28 AM
Creation date
4/23/2025 11:09:28 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
8/28/1989
Description
Regular Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Memo To :Mayor and City Council Members <br />From :Ric Minetor, City Engineer/Director of Public Works <br />Date :August 24, 1989 r <br />Subject :Water and Sewer Rate Analysis <br />Don Brager and I met with Robert Tautges of Voto, Tautges, <br />Redpath & Co. and Dan Boxrud of Short, Elliott, Hendrickson, Inc. <br />to discuss an analysis of our current water and sewer rates and <br />rate structure. As we previcusly discussed with Council, the <br />sewer rate may be considered to be more fair if it were <br />correlated to usage. Since it is not possible to meter sewer <br />discharge from each service connection, a method of estimation is <br />needed. Many cities have adopted a sewer rate based on winter <br />quarter water usage. The Council expressed a desire to study this <br />issue and consider the impacts on existing customers. We reported <br />to the Council that our current work load precludes us from doing <br />this study in house, and that it is appropriate to include a <br />review of our water rates and capital improvements at this time <br />as well. <br />Our meeting with Bob Tautges and Dan Boxrud resulted in a <br />determination that the appropriate procedure would be to have SEH <br />prepare the necessary engineering information and to have Voto, <br />Tautges, at al prepare the financial analysis. The attached <br />letters of proposal from these firms detail the services to be <br />performed. SEH's charge would be $12,500 based on their current <br />hourly rates in the current Engineering Agreement. Voto, Tautges, <br />Redpath & Co. Is charge are estimated to be $8,470, with a not to <br />exceed figure of $8,500. <br />I recommend that City Council authorize staff to enter into <br />agreements with Voto, Tautges, Redpath & Co. and with Short, <br />Elliott, Hendrickson, Inc. for a water and sewer rate analysis <br />with a combined total estimated cost of $21,000; with the cost of <br />this study is to be charged to the water and sewer system <br />maintenance accounts. <br />
The URL can be used to link to this page
Your browser does not support the video tag.