My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 1989/08/28
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
1980-1989
>
1989
>
Agenda Packets - 1989/08/28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2025 11:09:28 AM
Creation date
4/23/2025 11:09:28 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
8/28/1989
Description
Regular Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
11 <br />11 <br />a�•x;..rAd <br />August 18, 1989 <br />City of Mounds View <br />2401 Highway 10 <br />Mounds View, MN 55112 <br />Attn: Ric Minetor <br />11?E- T%17LECANACA:CAD, ST CAUL 4- ,NNE50TA 55177 511 4940171 <br />RE: MOUNDS VIEW, MINNESOTA <br />WATER SYSTEM STUDIES <br />SEH FILE NO: 87154 <br />Based on our meeting yesterday with Don Brager and Bob Tautges, <br />we are submitting this revised proposal for a study of the <br />following: <br />1. Treatment Plant No. 1 Upgrade <br />Option 1 - Two 1,000 GPM Special Media Pressure Filters <br />and Backwash Reclaim Tank. <br />Option 2 - Automate Existing Pressure Filter and Add <br />Backwash Reclaim Tank. <br />Option 3 - 2,000 GPM Gravity Filter and Backwash Reclaim <br />Tank. <br />2. Treatment Plant No. 1 & 3 Upgrade <br />Automate Existing Pressure Filters and Add Backwash Reclaim <br />Tank. <br />3. Supply, Storage, Treatment Analysis <br />Considering recent developments, review 1978 CED Study and <br />John Johnson Study, project ultimate capital needs. <br />4. Water Rate Analysis <br />Depending on the results of work by the auditors, re- <br />evaluate the timing of capital needs, and coordinate with <br />the auditor as necessary. The exact scope and cost of this <br />step can be better defined after we complete steps 1, 2 and <br />3 and the auditor has a preliminary rate study available. <br />
The URL can be used to link to this page
Your browser does not support the video tag.