Laserfiche WebLink
PIN <br />Memo To :Mary Saarion, Parks and Recreation Director <br />From :Ric Minetor, City Engineer/Director of Public Works <br />Date :September 20, 1989Uyi <br />Subject :Silver View Park Water and Sewer Service <br />Bid Results <br />On Wednesday, September 20th bids were opened for providing water <br />and sewer service in Silver View Park to the site of the proposed <br />picnic shelter. The results are listed below. <br />Bidder Base DIU Alt. A Alt, B <br />Volk Sewer & Water $24,680 $20,800 $17,500 <br />CCS Contracting 26,950 23,500 15,450 <br />0 & P Contracting 28,393 24,506 22,311 <br />The low bidder for both the base bid and alternate A is Volk <br />Water and Sewer. The low bidder for alternate B is CCS <br />Contracting. The base bid included the 4 inch sewer service and a <br />6 inch ductile iron water main, alternate A included the 4 inch <br />sewer service and a 6 inch PVC water main, and alternate B <br />included the 4 inch sewer service and a 2 inch polyethylene water <br />service. I strongly recommend the provision of a 6 inch water <br />main to this site; since the cost differential between the <br />ductile iron pipe and the PVC is less than $4,000, I believe it <br />is prudent to install the ductile iron water main. Therefore, my <br />recommendation is to award the contract to Volk Sewer and Water, <br />Inc. in the amount of their bid of $24,680 for providing and <br />installing a 4 inch sewer service and a 6 inch ductile iron water <br />main. <br />