Laserfiche WebLink
5/16/1990 <br />To Moundsview planning Commission <br />In reguards to curbing and gutter at 7660 Woodlawn Drive <br />As the new owner of this property my main concern is not the cost;, <br />of concrete curb and gutter as the builder responsible for this. <br />?y concern is if you rule that curb and gutter have to be installed <br />that in a couple years the patching of the asphalt will start <br />to break up and will be eye sore and a added expense to me. <br />The contractors that Ihave talked to say that to install a <br />B-6-12 curb and gutter the black topwould have to be cut back <br />aprox. 4 to 6 inches more to allow for the fogms and bracing. <br />That is the area that bothers me, it will be a patch job, and <br />will always look like one until a part of it breaks out then <br />it will be another patch. <br />The contractor that I have been talking to says 1 option <br />would be if the gutter could be left off he may be able to saw <br />cut the asphalt at the base of the curb, and use it as the form <br />edge, and 'nand build the concrete curb. <br />At this point I would like to see the asphalt curb left <br />as is and I would like to install spillways on the West and <br />south side. <br />On the West side I would install a 3' X 39' and on the south <br />side a 3' % 23' concrete spillway. Both spillways would have <br />a rock well at the base. <br />47-4- lz <br />lT <br />Thar} you <br />eo: <br />George Nagar <br />�/� P� rc.% <br />