My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 1987/08/24
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
1980-1989
>
1987
>
Agenda Packets - 1987/08/24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2025 10:14:41 AM
Creation date
4/28/2025 10:13:30 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
8/24/1987
Description
Regular Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MEMO TO: MAYOR AND CIT!' COUNT <br />r <br />FROM: CLERK -ADMINISTRATOR <br />DATE: AUGUST 24, 1987 <br />SUAJECT: MAN HOLE EXTENSION AT 2741 ARDAN AVENC� <br />As you recall, the residents at 2741 Ardan Avenue recently <br />appeared before you at an agenda session regarding the <br />replacement of a 6 foot high concrete pipe over the manhole <br />in their rear yard. At that time, these residents <br />questioned the purpose for which this pipe was placed there <br />and the serviceability of the pipe. <br />Attached please find a memo from the City's consulting <br />engineer, Dan Boxrud, responding to my request that he <br />review the matter after a field inspection with Public Works <br />Foreman Rose and myself. Dan makes the comment that the <br />previous structure adequately restrained the Lack -up of <br />storm water and this statement will be refuted by the <br />residents, however, it should be pointed out that the reason <br />the pine did not hold back water was that the concrete frame <br />on which it was placed had been broken out by the residents <br />in order to allow the water, to redrain into the catch basin <br />after the major storm water flow had subsided within the <br />underground pipe rystem. <br />The proposal -at this time is to place a 4 foot manhole <br />section over the existing catch basin with a small :sole in <br />the bottom having a modified "check valve" over it to <br />restrict the flow of the water into the yards through this <br />hole. It will essentially allow for the water to back up <br />into the pipe closing the check valve during its upward flow <br />and prevent water from getting into the yards in this area. <br />Once the water has subsided the check valve will open and <br />any water collecting in the yards durinq the storm will be <br />able to drain into the pipe. Mr. Boxrud indicates, based on <br />this concept, that he feels the proposed pipe extension will <br />function as intended. Staff would request direction in this <br />matter. <br />DFP/mjs <br />Attachment: <br />
The URL can be used to link to this page
Your browser does not support the video tag.