Laserfiche WebLink
MEMO TO: MAYOR AND CITY COUNCIL <br />FROM: MARY SAARION, DIRECTOR <br />PARKS, RECREATION AND FORESTRY <br />DATE: NOVEMBER 4, 1987 <br />RE: SECURITY LIGHTING AT GROVELAND <br />This is just a note to inform you about the security lighting plans <br />for Groveland Park as per the petition request by residents and <br />approved by the City Council. NSP has already placed a street light <br />on Fairchild midway between the park boundary property. <br />Gopher Electric has been consulted regarding the in -the -park <br />security lighting. The electrical work done at Groveland regarding <br />the rink i:ghts was only done on a temporary basis in 1985 because <br />the ground was frozen at the time of installation.. For this reason, <br />the connections of additional electrical needs means bringing the <br />Groveland electrical system up to code. This would have to be done <br />regardless. if another security light is added or not. An overhead <br />electrical wire from the building to the near pole reeds to be <br />placed underground. The wires fed from the near pole to the far <br />r <br />pole are not sufficient to feed a security light on the far pole. <br />Therefore, another wire would have to be laid and a separate box <br />would have to be placed on the far pole and the on -off switch for <br />_y�;a4 <br />rink lights would have to be by hand from the pole rather than by a <br />switch in the building. Also, a security light on the far pole <br />would shine mostly on the neighbors yard and would not light up a <br />A4I <br />strategic area of the park ... only the barren outfield area. The <br />expense for this work done would be significant. <br />It is necessary to go ahead and bury the overhead line and F,7ovide <br />adequate electrical needs for a high pressure sodium light placed <br />towards the tot lot and attached to the existing near pole. This <br />light request is the easy part. <br />The minimum cost of this work as quoted by Gopher Electric is <br />$490.00. This includes the upgrading of the electrical work to <br />code, burying the overhead wire, installation and purchase of the <br />security light. <br />The installation of the mid -park area is more difficult. One <br />possibility is to hava a flood light installed onto the new <br />northeast tennis light pole. This light would shine towards the <br />ballfield and open field area and would illuminate the center of the <br />park. <br />