My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 1987/02/09
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
1980-1989
>
1987
>
Agenda Packets - 1987/02/09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2025 10:51:12 AM
Creation date
4/28/2025 10:51:12 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
2/9/1987
Description
Regular Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• Subdivision 4. Pipe Fitting: <br />(1) gas, oil piping <br />use Valuation Table , <br />(2) steam, hot water heating <br />$20.00 plus $5.00 per <br />systems <br />100,000 BTU per hour <br />or fraction thereof <br />over 200,000 BTU per <br />hour <br />(3) fire extinguishing equipment <br />(a) standpipes <br />$15.00 per standpipe <br />(b) sprinkler equipment <br />$15.00 plug $3.00 for . <br />each ten sprinkler heads <br />or fraction thereof over <br />ten heads <br />Subdivision 5. Plumbing Work: <br />(1) plumbing fixtures, devices, <br />$10.00 plus $3.00 par <br />connections <br />fixture, device and <br />• <br />connection <br />(2) garbage grinder or disbwasher <br />$5.00 per unit <br />Subdivision 6. Refrigeration Work: <br />(1) equipment under 100,000 BTU <br />$10.00 plus $2.00 per <br />per hour capacity (12,000 BTU <br />10,000 BTU per hour or <br />per ton) <br />fraction thereof over <br />in,no4 BTU per hour <br />Capacity <br />(2) equipment over 100,000 BTU <br />$30.00 plus $5.00 per <br />per hour capacity (12,000 BTU <br />100,000 BTU per hour <br />per ton) <br />or fraction thereof <br />over 100,000 BTU per <br />hour capacity <br />Subdivision 7. Signs, Billboards. <br />�R) signs up to 100 square feet <br />$20.00 plus $5.00 per <br />f17- <br />25 square feet or <br />Lf <br />fraction thereof <br />(2) signs 100 square feet and over <br />$40.00 plus $10.00 per - <br />100 square feet or <br />fraction thereof <br />Subdivision e. Hestia and <br />Ventilation work. <br />(1) gas, oil burner equipment <br />$20.00 plus $5.00 per <br />100,000 BTU per hour or <br />fraction thereof over <br />100,000 BTU per hour <br />input <br />(2) gravity warm air heating <br />$30.00 per installation <br />repnlr, alteration, or <br />extension <br />(3) mechanical warm air heating <br />$20.00 plus $5.00 per <br />100,000 BTU per hour <br />or fraction thereof over <br />200,000 BTU per hour <br />Input capacity ' <br />(4) duct or tin work <br />use Valuation Table <br />(5) ventilation systems <br />(a) using fans less then 100 CFM <br />$5.00 plus $1.00 for <br />each fan <br />(b) using fans more than 100 CFM <br />$2.0.00 plua $2.00 per <br />1,n00 CFH or fraction <br />thereof over 3,000 CFM <br />plus $5.00 for each fur'" <br />
The URL can be used to link to this page
Your browser does not support the video tag.