Laserfiche WebLink
r <br />C.l <br />PRESENT <br />PROPOSED <br />FEES <br />FEES <br />Building Permit <br />$343.00 <br />$504.50 <br />Plan Check Fee <br />68.60 <br />100.90* <br />State Surcharge <br />35.00 <br />35.00 <br />Storm Water Mangement (SWM) <br />170.00 <br />170.00 <br />BUILDING PERMIT TOTAL <br />$616.60 <br />$810.40 <br />Plumbing <br />36.00 <br />41.00 <br />(7 Fixture 6 Dishwasher) <br />Mechanical <br />37.00 <br />49.00 <br />Driveway <br />8.00 <br />10.00 <br />Sewer <br />10.00 <br />10.00 <br />Water <br />10.00 <br />10.00 <br />Sewer Availability <br />525.00 <br />525.00 <br />Charge (SAC) <br />Water Availability <br />200.00 <br />200.00 <br />Charge (WAC) <br />Unit Charge <br />100.00 <br />100.00 <br />TOTAL FEES $1,542.60 <br />$1,755.40 <br />DIFFERENCE + 13.8 % <br />* If the percentage of the plan check fee was increased from <br />20% to 65%, the dollar amount would increase from $100.90 to <br />to $327.93 for a difference of $227.03 (based on the $504.50 <br />building permit fee). Building permit total would be <br />$1,037.43. Total fees would increase to $1,982.43•for a <br />+28.5% difference. <br />ATTACHMENT $4 <br />