My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 1987/07/13
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
1980-1989
>
1987
>
Agenda Packets - 1987/07/13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2025 12:27:11 PM
Creation date
4/28/2025 12:27:11 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
7/13/1987
Description
Regular Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ear <br />(!t <br />Commercial Division <br />107r1 <br />3141516/ <br />July 15, 1987 0) JUL1987 <br />cO RECEIVED. 'N <br />Mr. Donald F. Pauley, Clerk/Administrator CITY OF <br />City of Moundsview d MOUNDSV►E14! <br />2401 Highway 10 tern,2/ L1�' <br />Moundsview, Minnesota 55112 /ioiv2�� <br />Subject:.. Mi-11er-Proj5bYEYjj:,—. - ...._.. - �-: = x ?? <br />73 Acres <br />Moundsview, Minnesota <br />Dear Mr. Pauley: <br />Please allow this letter to serve as our request to be placed on <br />the calendar for the upcoming agenda session. <br />It is our intention to map out an area suitable to us and begin a <br />surface reclamation operation immediately. That is to say, import <br />concrete and asphalt, relaim it and sell the end product. This <br />would allow us to offset the carrying costs of the property during <br />design, development and construction stages without municipal <br />involvement. <br />We plan to begin design of a golf course and construction of same <br />within a prescribed period of time on the site designated by the <br />City. <br />We intend to draft a conceptual plan for the overall development <br />_,consistent with the City's goals. This plan will be very time <br />consuming. <br />The long term development concept on the Miller site may include <br />the designated removal, pulverizing and sale of black dirt coinciding <br />with the construction of area ponds. This pond acreage will be large <br />enough to control high water tables and serve other development needs. <br />This controlled construction allows reduced municipal involvement <br />in land acquisition and would coincide with careful and precise <br />planning of a high quality Industrial Park to compliment the golf <br />course. <br />443 8TH AVENUE NW NEW BRIGHTON, MN. 55112 (612) 633-6944 <br />
The URL can be used to link to this page
Your browser does not support the video tag.