My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 1987/11/23
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
1980-1989
>
1987
>
Agenda Packets - 1987/11/23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2025 12:45:55 PM
Creation date
4/28/2025 12:45:55 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
11/23/1987
Description
Regular Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MEMO TO: MAYOR AND CITY COUNCIL <br />FROM: CLERK-ADMINISTRATO 6) <br />DATE: DECEMBER 1, 1987 <br />SUBJECT: PUBLIC WORKS GARAGE ADDITION <br />Attached please find a memorandum from Mr. Darwin Lindahl of <br />Short -Elliott -Hendrickson, the City's architectural <br />consultant on the Public Works garage addition and a <br />from Cottonwood roposal for eConstructionndments to ,1ethe ncontractor tract for tfor he athis <br />lon <br />project. <br />The proposed amendments to the contract would call for the <br />installation of a block wall in a portion of an existing <br />storage room in order to atilize this room as a locker room <br />as well as the installation of a door and wood decking above <br />the locker room for storage. The second change is for the <br />installation of a door to allow accesstfrom <br />the <br />newas. The <br />breakroom into the locker room and <br />third change would call for the installation of a fire house <br />outlet and sillcock inside the new garage addition for <br />purposes of filling the City's jet rodder and providing <br />larger water flows for filling various tanks. <br />As indicated by Mr. Lindahl, this work had been proposed to <br />be accomplished by the City's Public Works crew, however, as <br />was the case with other items on L'ie contract, I have <br />learned that the ability of our crews to do this work is <br />limited, if not non-existent, and/or the timing for this <br />work is such that our crews would be unable to accomplish it <br />without causing severe delays in the current construction <br />schedule therefore, I would recommend that Council approve a <br />change order to the contract in the amount of $3,245 to <br />allow for this work to be accomplished by Cottonwood <br />Construction. <br />DFP/mjs <br />Attachment: <br />
The URL can be used to link to this page
Your browser does not support the video tag.