My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 1988/01/19
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
1980-1989
>
1988
>
Agenda Packets - 1988/01/19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2025 12:57:21 PM
Creation date
4/28/2025 12:57:21 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
1/19/1988
Description
Work Session
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Annual Maintenr.nce Program ; <br />Based on a 5 year mainteance cycle then on an annual basis 89,236 square - <br />yards of local streets should be targeted for mainteance and 30,728 square <br />yards of NSA streets should be targeted for maintenance. <br />The surface distress <br />tsurvey <br />he asandmNSAiroadisegments Tables 6 and 7 indicated the <br />following for <br />list, <br />Local X <br />Severe 20,566 5.Y. 10,509 S.Y. 31,075 S.Y. 5.2 <br />Moderate 1124.4 <br />,769 S.Y. 113,089 S.Y. 225,858 S.Y. 37.7 <br />Slight 296,294 S.Y. 30,040 S.Y. 316.553 �.Y. 52__7 <br />Unbuilt 16,553 5.Y. <br />TOTAL 446,182 S.Y. 153,6 <br />38 S.Y. 599,820 S.Y. <br />ir <br />nd <br />the <br />The estimated repair cost are and sealdon coatrtoatheamoderatefroadgsegmentseand <br />road segments with rep• <br />seal coat to the slight ^oad segments. <br />Costs were estimated in 1984 dollars and for study purposes are as - <br />follows: <br />1. Severe - 3•, repairoverlay@ S10.00/sy <br />for 20:: of area or <br />TOTAL <br />i 2. Moderate-3'•repair @ S10.00/sy <br />for 10:: of area <br />seal coat <br />TOTAL <br />3. Slight -seal ..oat <br />53.00/sy <br />cr 52.00/sy <br />52.00/sy <br />S5.00/SY <br />S1.00/ sy <br />S0.50/sy <br />$0.50/ey <br />This results in a system maintenance cost as follows: <br />Severe S 31,100 sy <br />Moderate 225,900 sy <br />Slight 32G,300 sy <br />TOTAL <br />@ $5.00/sy = 0155,500 <br />@ 51.50/sy = 338,850 <br />@ SO.50/sy = 163,150 <br />5657,500 <br />The alternative to an annual mainteance program is to allow the system to <br />totally wear out with subsequent replacement. Based on 599,300 square <br />yards in the Local and NSA street systems anditment a rreeplacementovecost the next 10 <br />Of <br />$6.00/square yard would require a S3,598,8 <br />to 20 years. <br />Recommended Annual Maintenance proRLa <br />It is recommended that a 5 year program be continued. This would require <br />an annual investment of 5131,500.00 in 1984 dollars. It is further <br />recommended that the area of severe surface distresswithtreceivebalaan of the <br />accelerated 3 year program of 552,000 p year <br />
The URL can be used to link to this page
Your browser does not support the video tag.