Laserfiche WebLink
r APPENDIX "B" <br />DISTk.CT STATUS <br />Municipal Development District No. 3 is made up of land owned by the City, <br />two developers and the State of Minnesota. The area is currently undeveloped but <br />has been considered for industrial/commercial development. As a result of <br />development interest, the area was studied by Ramsey County Soil and Water <br />Conservation Department to evaluate certain wetland characteristics as well as by <br />the developer's engineers. Both reports were evaluated by Braun Environmental <br />Laboratories in 1983 for the City. The basic conclusion, of the report on the <br />reports was that the proposed Miller industrial Park Proposal did not have any <br />severe Impacts on the surrounding wetlands. <br />In addition to the concerns of environment, the site has an overburden of <br />soil that would ha%c to be removed and filled in order to develop the <br />Industrial/commercial park. The Braun Report indicates that once the soil Is <br />removed and replaced with engineered fill, it would support the type of tuildings <br />that would be associated with an industrial park. <br />The proposal to develop this area has laid dormant since the report was <br />published in 1983. This has to do with the high cost to cure the soil conditions. It <br />Is proposed that tax increment financing be utilized to help defray the costs of soil <br />corrections In order to provide the site with a competitive position In the <br />® Industrial/commercial land market. But for this action, the site would not be <br />developed. <br />0 <br />The City has also considered utilizing the fifty acre plus v? State land <br />(excess taking) and combining with other undeveloped land and City owned land <br />adjacent to it for a recreational area Including a nine -hole golf course. This <br />provision of the plan would compliment the proposed Industrial park development <br />as well as a City wide benefit. <br />Current Projects <br />1. The Miller industrial Park Proposal includes seven sites that could <br />pradnec a m.-Ch as '.3'0,000 byuare feet of manufacturing%warehouse and 160,000 <br />square feet of office/retail. These ar_ preliminary and mad be modified depending <br />on soil correction costs in relation to building location. <br />2. A recreational project that would include a nine -hole golf course. it <br />Is expected that this investment will promote the desirability of the adjacent <br />undeveloped industrial and commercia! areas and add a much nee&)d competitive <br />clement for the deve!opmeni of the City as a whole. The project would not be <br />economically feasible without the use of tax increments to assist with these <br />improvements. <br />Appendix "B" - 1 <br />