Laserfiche WebLink
MEMO TO • Mayor and City Council <br />FROM: City Planner Herman <br />DATE: March 3, 1988 <br />SUBJECT: SITE PLAN CHANGES FOR MOUNDS VIEW BUSINESS <br />PARK, BUILDING G <br />Attached you will find a letter from Tim Nelson explaining the <br />proposed changes in the site plan for Building G. As you know, <br />Everest Development is proposing to increase the square footage <br />of the building whict. therefore necessitates a reduction in <br />parking spaces of 76 spaces. If the expansion parking was put <br />into use at a future date the difference between the approved <br />plan from the proposed would be 150 spaces (763-613). <br />A second issue raised was the iroposed changes in landscaping. <br />The City ?orester has reviewed the site plan and has requested <br />additional information regarding the boulevard tree plantings. I <br />have told Tim Nelson that the Forester has requested a <br />cross-section drawing of the boulevard area which would show the <br />^, ponding and tree placement. I expect to receive that early next <br />iv week. The Forester is also in contact with the landscape <br />architect to discuss the species selection. Some changes may <br />occur in that area. <br />The City Engineer has reviewed the change in the ponding for the <br />site and has no problems with it. In fact the change from one to <br />three p9dds has increased the ponding capacity over the original <br />plan. <br />Also attached is d memo the Council previously received from me <br />relayinc what concerns the Planning Commission had after <br />reviewing the proposed changes. <br />KH/bac <br />Attachments <br />