Laserfiche WebLink
Site Name 126310 Mounds View School District Community Center Survey Date 2/11/2025 <br />Construction Type <br />Building Type u Block <br />Ceiling Type L� Finished <br />uipment Location <br />CJConcrete Wood <br />❑ Concrete ❑ Steel <br />I ^ i Steel <br />X,1Suspended <br />L1 Other <br />C Ceiling Height <br />7n'-7a.' <br />Entry Room Location Existing Entrance From City Hall - Roof Access / Riser Room Demarc <br />Building is a MDU No If Yes - How many units <br />Is New mounting board Needed Yes If Yes - Size 24" x 24" Custom Size <br />Is Power Available Yes Power Type AC Is Power strip Needed No <br />#1 Equipment Type OSP Fiber Termination Panel Mount Type Wall Mount <br />Equipment Location: Roof Access / Riser Room Demarc <br />#2 Equipment Type ISP Fiber Termination Panel Mount Type Rack Mount <br />Equipment Location: Network Room <br />#3 Equipment Type Arvig NID Mount Type Rack Mount <br />Equipment Location: Network Room <br />#4 Equipment Type Mount Type <br />Equipment Location: <br />#5 Equipment Type - <br />Equipment Location: <br />Cable Pathway <br />Inside Wiring Needed? Yes <br />Cable Type Indoor ISP Fiber <br />Install in new FICable Tray Surface <br />Existing ❑ Cable Tray L Surface <br />Existing Cable <br />OSP Cable <br />Is Dielectric Fiber Required? No <br />Notes <br />Mount Type <br />If Yes - How many Feet -150' <br />Count: Std. <br />------------------.----------------------------- -- ---- - --- <br />LSteel Girder .Conduit <br />Cable Straps U Conduit <br />Fiber Connector Type <br />If Yes - How many feet <br />Other <br />❑ Other <br />*Arvig will enter the building through an existing Duct from City Hall in the Roof Access / Riser Room Demarc. <br />*Arvig will install an OSP Fiber Termination Panel on a new 24" x 24" Backboard in the Roof Access / Riser Room Demarc. <br />*Arvig will then extend the ISP fiber cable approximately 150' through the building and into the Network Room. <br />*Arvig will install the ISP Termination Panel and Arvig NID in the provided rack space in the Network Room. <br />*AC power is available within 6' of the Arvig Network Interface Device (NID) location in the provided rack space. <br />*Arvig will close all openings created for this installation, if any, with the appropriate sealant for each application. <br />*All measurements on this document are deemed reliable, but approximate, and are subject to change at install. <br />Is a 3rd Party Building Access Agreement required (BAA)? Yes <br />Are there any Geothermal Wells on the Property? No <br />Sitewalk By Arvig Rep: Hunter Farnick Building Rep: Doug Erickson <br />Prepared By: JVL • Mounds View School District Site Survey <br />Revision - (0) a r vI Community Center <br />Drawn - 2121/2025 � 5394 EDGEWOOD DR Sheet + #�2 <br />126310 I�' ° MOUNDS VIEW, MN 55112 <br />