Laserfiche WebLink
n <br />u <br />C.V. HOULE BID TAB <br />MOUNDS VIEW BUSINCSS PARK <br />PROJECT NO. 86-106 <br />SCHEDULE A - SANITARY SEVER <br />ITEM. <br />NO. DESCRIPTION <br />1. 8' PVC, 8-10' DEEP <br />2. B' PVC, 30-12' DEEP <br />3. 8' PVC, 12-14' DEEP <br />4. 8' PVC, 14-16' DEEP <br />S. 8' PVC, 16-18' DEEP <br />6. 8' PVC, 18-20' DEEP <br />7, S' PVC, 20-22' DEEP <br />8. B• PVC, 22-24' DEEP <br />9. 8' STANDARD MANHOLE <br />10. EXTRA DEPTH OVER 8' <br />11. CUT INTO EXISTING 6N <br />12. ROCK STABILIZATION <br />13. EXISTING MH ADJUSTMENTS <br />14. TELEVISE SANITARY SEWER <br />SUBTOTAL SANITARY SEWER A <br />SCHEDULE B - WATERMAIN <br />ITEM <br />NO. <br />1. <br />2. <br />3. <br />4. <br />5. <br />6. <br />7. <br />B. <br />9. <br />20. <br />11. <br />12. <br />13. <br />• REVISED BID ESTIMATE <br />+ <br />ORIGINAL BID <br />ESTIMATE <br />• <br />WITH CHANCE <br />ORDER <br />• REVISED:. <br />• <br />ESTIMATED <br />BID <br />BID <br />• ESTIMATED <br />BID <br />BID <br />• BID AMOUNT <br />UNIT <br />QUANTITY <br />PRICE <br />AMOUNT <br />• QUANTITY <br />PRICE <br />AMOUNT <br />• DIFFERENCE <br />L.F. <br />590 <br />011.35 <br />$6,696.50 <br />• 322 <br />611.35 <br />63,654.70 <br />• 03,041.00 <br />L.F. • <br />1480 <br />811.35 <br />816,798.00 <br />• 598 <br />e11.35 <br />86,787.30 <br />• (010,010.70 <br />• $14,690.05 <br />L.F. <br />57 <br />- 814.35 <br />0817.95 <br />• 1080 <br />014.35 <br />815,498.00 <br />L.F. • <br />109 <br />617.35 <br />Si,891.15 <br />• 65 <br />817.35 <br />$1,127.75 <br />• (8763.40 <br />L.F. <br />59 <br />022.35 <br />$1,310.65 <br />• 65 <br />822.35 <br />01,899.75 <br />• 0581.10 <br />L.F. • <br />30 <br />$26.35 <br />0790.50 <br />• 68 <br />026.35 <br />01,791.00' <br />• 01,001.30 <br />L.F. • <br />140 <br />820.35 <br />03,969.00 <br />• 60 <br />428.35 <br />91,701.00 <br />• (42,268.00 <br />L.F. • <br />45 <br />32.35 <br />01,455.75 <br />• 75 <br />32.35 <br />82,426.25 <br />, 8970.50 <br />EACH • <br />7 <br />0045.00 <br />06,615.00 <br />• 6 <br />0945.00 <br />$5,670.00 <br />• - (4945.00 <br />V.H. <br />21 <br />064.00 <br />01,344.00 <br />• 31 <br />064.00 <br />$1,984.00 <br />• 0640.00 <br />EACH <br />1 <br />36,400.00 <br />$6,400.00 <br />• 1 <br />06,400.00 <br />$6,400.00 <br />• 00.00 <br />60.00 <br />TON <br />470 <br />60.01 <br />34.70 <br />• 470 <br />6 <br />40.01 <br />$140.00 <br />84.70 <br />8040.00 <br />• <br />• 00.00 <br />L.F. <br />6 <br />0140.00 <br />00.40 <br />0840.00 <br />$1,004.00 <br />• <br />• 1945 <br />80.40 <br />0778.00 <br />• (0226.00 <br />L.F. <br />2,510 <br />• <br />049,945.20 <br />• <br />650,563.25 <br />+ 8618.05 <br />• <br />............... <br />• <br />............ <br />• ........vn <br />ORIGINAL BID <br />ESTIMATE <br />• <br />ESTIMATED <br />BID <br />BID <br />DESCRIPTION <br />UNIT • <br />QUANTITY <br />PRICE <br />AMOUNT <br />6' DIP, CLASS 52 <br />L.F. <br />705 <br />811.00 <br />S7,755.00 <br />8' DIP, CLASS 52 <br />L.F. • <br />4,300 <br />013.35 <br />857,405.CO <br />10' DIP, CLASS 52 <br />L.F. • <br />2,135 <br />015.90 <br />833,946.50 <br />12' 'DIP, CLASS 52 <br />L.F. • <br />1,500 <br />$18.95 <br />028,425.00 <br />b' GATE VALVE 6 BOX <br />EACH • <br />10 <br />$480.00 <br />84,800.00 <br />10' GATE VALVE 6 BOX <br />EACH <br />3 <br />0650.00 <br />01,950.00 <br />12' GATE VALVE 6 BOX <br />EACH • <br />4 <br />$760.00 <br />03,040.00 <br />HYDRANT W/6• MATE VALVE <br />EACH <br />20 <br />01,410.00 <br />328,200.00 <br />FITTINGS <br />LBS • <br />7,665 <br />01.00 <br />$7,665.00 <br />• REVISED BID ESTIMATE <br />• <br />,;,-fl <br />�--' <br />WITH CHANGE <br />ORDER <br />• <br />REVISED <br />• ESTIMATED <br />• O:.INTITY <br />BID <br />PRICE <br />BID <br />AMOUNT <br />• <br />• <br />3ID AMOUNT.;?} <br />DIFFERENCS,� <br />. <br />y <br />• 630 <br />011.00 <br />$6,930.00 <br />• <br />(0825.00)'. <br />4540 <br />013.35 <br />$60,609.00 <br />• <br />e3,204.00 <br />• 2135 <br />015.90 <br />033,946.50 <br />• <br />00.00 <br />• 1950 <br />618.95 <br />$36,952.50 <br />• <br />48,527.50' <br />• 10 <br />8480.00 <br />$4,800.00 <br />6 <br />80.00 <br />• 4 <br />0650.00 <br />$2,600.00 <br />• <br />$650.00 <br />5 <br />0760.00 <br />03,800.00 <br />• <br />$760.00 - <br />• 20 <br />81,410.00 <br />$28,200.00 <br />• <br />♦0.00 <br />• 9880 <br />$1.00 <br />09,880.00 <br />• <br />$2,215.00 <br />S325 00 <br />$975 00 <br />• <br />$0.00 '. <br />CONNECT TO EXIST WATERMAIN <br />EACH • <br />3 <br />$325.00 <br />$975.00 <br />12' WET TAP W/TAPPING <br />EACH • <br />2 <br />01,850.00 <br />03,700.00 <br />SLEEVE <br />REMOVE EXISTING WATERMAIN <br />L.F. <br />21010 <br />02.50 <br />$5,025.00 <br />ROCK STABILIZATION <br />TON <br />830 <br />80.01 <br />08.30 <br />SUBTOTAL WATERMAIN B <br />.�182,894.80• <br />3 <br />3 <br />01,950.00 <br />05,550.00 <br />• $1.850.00 - <br />450 <br />02.50 <br />$1,125.00 <br />• CS3,900.00)... <br />830 <br />00.01 <br />08.30 <br />• $0.00 <br />0195,376.30 <br />$12,481.50 <br />............ <br />• ............ <br />