My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 1988/05/02
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
1980-1989
>
1988
>
Agenda Packets - 1988/05/02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2025 11:43:09 AM
Creation date
6/16/2025 11:29:42 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
5/2/1988
Description
Work Session
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Short Elliott Hendrickson, Inc. <br />April 12, 1988 <br />Page 2 <br />Service the Boiler Operating and Safety Controls <br />3. Some of the boiler controls wiring looks as though it has <br />been redone in a not so professional manner. We suggest a <br />service company be engaged to examine and check the boiler <br />safety and operating controls. <br />We suggest Berghorst Heating Co. and would expect the cost to <br />be under $250.00. <br />Change Starter Control for Heating Pump <br />5. The heating pump will not automatically restart if the <br />electric power goes off. The control of the starter should <br />be changed to a "maintained contact switch". <br />This can be done by any licensed electrical contractor. We <br />estimate the probable cost will be about $200.00. <br />Thermostat Settings <br />We suggest allowing the people in each space to control their <br />own thermostat settings. Because of the differences in <br />personal metabolism, some people like their space cool and <br />some like it warmer. The thermostats have been set lower <br />than many people like, and they have complained. We believe <br />production suffers more than energy saved. <br />No cost is anticipated to set thermostats. <br />Power for Micro Computers <br />7. The upper and lower level office areas can be re -circuited to <br />provide a separate circuit at each computer location. An <br />isolated ground should be provided for each circuit. <br />Electrical construction in the foregoing areas and at the <br />panelboards is estimated to be $5,000. to $6,000. <br />The work described above should be implemented this summer, <br />particularly with respect to the heating functions so the systems <br />can function satisfactorily next winter. <br />M <br />�i' <br />
The URL can be used to link to this page
Your browser does not support the video tag.