Laserfiche WebLink
11 <br />- 4 - <br />10. Design specification and plan for all sediment and <br />u rnainn nnnfrnl measures as well as all oradi Eq and <br />The developer was to have submitted this information with <br />the permit application. On June 22, 1988, Merila and <br />Associates submitted a time specific construction schedule <br />and information regarding the temporary road. <br />4. CONDITIONAL USE PERMIT FOR WORKING IN A FLOOD PLAIN <br />49.03, Subdivision 3, Standards for F.Z.D. Condi- <br />Barr Engineering has found that the proposed development <br />will not increase the flood height of the wetland. <br />M <br />