Laserfiche WebLink
Public Works Staff Report <br />The following is the List of Parks and projects / maintenance activities ongoing or planned this year. <br />Current updates are in black text, and updates from the previous two -month period are in grey. <br />Arlan Park <br />(Winberg Companies) Pond Water Quality Project plants are coming along. Project Ardan volunteers <br />helped overseed and straw sparse growing areas. <br />CiN Nall campus <br />Trail gate installation off Edgewood Dr. on trial near splash pad (Fall 2025) <br />Police department lot landscaping and rock installation <br />Splash pad repairs and cleaning <br />• Assisted with BCBS concrete installation and footings <br />• BCBS fitness court- added fill around the new concrete pad (grading) <br />• Daily splash pad water quality inspections <br />• Splash pad. repairs —replaced chemical lines <br />• Playground repairs <br />Groveland Park: <br />, Mowing, whipping and trash and litter checks <br />Greentield Park: <br />• Mowing., Whipping and trash and litter checks <br />v Irrigation - several repairs <br />Hillview Park: <br />• Mowing, whipping and trash and litter checks <br />• Replaced ballfield bench boards <br />Lambert Park <br />• Mowing, whipping and trash and litter checks <br />a Replaced ADA swing mounts and chain <br />• Replaced toddler swing <br />Oakwood Park <br />Mowing, whipping and trash and litter checks <br />Replaced ADA swing mounts and chain <br />2 1 P a g e <br />