Laserfiche WebLink
2026 Mounds View Fee Schedule Page 15 of 16 <br />Size Over 4 Inches <br />Water Service Inspection or Reinspection After <br />Hours <br />After hours call-out rate per visit (Minimum 2 hours) <br />Manual Water Meter Read After hours call-out rate per visit <br />Hydrant Meter Deposit $2,500 <br />Hydrant Meter Rental (One Week Minimum) $50 per week <br />$150 per month <br />Water Shut-Off/Turn-On No charge during normal business hours, otherwise one <br />hour at call-out rate per visit <br />Water Shut-Off/Turn-On (Snowbirds) $50 per shut –off <br />$50 per turn-on <br />Water Meter Testing Call-out rate per visit (Minimum 2 hours) <br />Water Testing One hour at call-out rate <br />Water Meter City cost plus 10% administrative fee <br />Curb Stop – Valve Cover City cost plus 10% administrative fee <br /> <br />Municipal Sanitary Sewer System Fees (Title V, Chapter 52) <br /> <br />I/I Application Fee – H20PP Program $150 per lateral line <br />Sewer Service Availability Charge (SAC) $2,485 per Metropolitan Council Environmental Services <br />Sewer Usage Rate $3.75 per 1,000 gallons water sold per quarter <br />Sewer Service Charge, Residential $47.06 per residential equivalent unit (REU) connection <br />per quarter <br />Sewer Service Charge, Commercial/Industrial/ <br />Public Buildings and Churches <br />$115.58 per REU connection per quarter <br />Sewer Connection/Repair/Disconnect $100 150 plus surcharge <br />Sewer Unit Charge (New Connection Only) $150 per connection <br />Sewer Inspection or re-inspection after hours. Call-out rate per visit (Minimum 2 hours) <br /> <br />Surface Water Management (SWM) Utility Fees (Title V, Chapter 53) <br /> <br />SWM New Construction, R-1 $212 per lot <br />SWM New Construction, R-2 $1,038 per acre <br />SWM New Construction, R-3, R-4, R-O $1,500 per acre <br />SWM New Construction, B-1, B-2, B-3, B-4 $1,500 per acre <br />SWM New Construction, I-1, PUD $2,096 per acre <br />SWM Utility Rate Charge, R-1 Single Family and <br />R-2 Single and Two Family Residential <br />$18.50 per unit per quarter <br />SWM Utility Rate Charge, R-3 Medium Density <br />Residential <br />$101.02 per acre per quarter <br />SWM Utility Rate Charge, R-4 High Density <br />Residential, R-5 Mobile Homes and R-O <br />Residential Office <br />$119.79 per acre per quarter <br />SWM Utility Rate Charge, B-1 Neighborhood <br />Business, B-2 Limited Business, B-3 Highway <br />Business and B-4 Regional Business <br />$156.91 per acre per quarter <br />SWM Utility Rate Charge, I-1 Industrial $127.14 per acre per quarter <br />SWM Utility Rate Charge, PUD Planned Unit <br />Development <br />$138.94 per acre per quarter <br />SWM Utility Rate Charge, CRP Conservancy, <br />Recreation and Preservation <br />$18.50 per acre per quarter <br />SWM Utility Rate Charge, School or Church, <br />Public or Private <br />$56.38 per acre per quarter