Laserfiche WebLink
2026 Mounds View Fee Schedule Page 5 of 16 <br />Plumbing Inspection Permit, Residential and Commercial <br />(State Surcharge Required, See Appendix B) <br />Minimum $60 or 1.25% of Valuation, whichever is <br />Larger <br />Plumbing Permit Plan Review, Commercial <br /> <br />Plumbing system plans and specifications that are submitted to the City of Mounds View for review shall be <br />accompanied by the appropriate plan examination fees shall be paid prior to plan approval. The City of Mounds <br />View shall charge the following fees for plan reviews and audits of plumbing installations for public, commercial, <br />and industrial buildings: <br />1. Systems with both water distribution and drain, waste, and vent systems and having: <br />a. 25 of fewer drainage fixture units, $150 <br />b. 26 to 50 drainage fixture units, $250 <br />c. 51 to 150 drainage fixture units, $350 <br />d. 151 to 249 drainage fixture units, $500 <br />e. 250 or more drainage fixture units, $3 per drainage fixture unit to a maximum of $4,000; and <br />f. Interceptors, separators, or catch basins, $70 per interceptor, separator, or catch basin design <br />2. Building sewer service only, $150 <br />3. Building water service only, $150 <br />4. Building water distribution system only, no drainage system, $5 per supply fixture unit or $150, <br />whichever is greater <br />5. Storm drainage system, a minimum fee of $150 or: <br />a. $50 per drain opening, up to a maximum of $500; and <br />b. $70 per interceptor, separator, or catch basin design <br />6. Manufactured home park or campground, one to 25 sites, $300 <br />7. Manufactured home park or campground, 26 to 50 sites, $350 <br />8. Manufactured home park or campground, 51 to 125 sites, $400 <br />9. Manufactured home park or campground, more than 125 sites, $500 <br />10. Revision to previously reviewed or incomplete plans: <br />a. Review of plans for which the city has issued two or more requests for additional information, per <br />review, $100 or ten percent of the original fee, whichever is greater <br />b. Proposer-requested revision with no increase in project scope, $50 or ten percent of original fee, <br />whichever is greater <br />c. Proposer-requested revision with an increase in project scope, $50 plus the difference between <br />the original project fee and the revised project fee--- <br /> <br />Zoning Permits (No Surcharge) Title XV, Chapter 150.050(C)(2) <br />Technology Fee $3 per permit <br />Patio/Deck 30” and under, or not attached $30 <br />Driveways, Sidewalks, Parking Lots, Patios (no permit required for sealcoating or overlays without expansion). <br />A right-of-way permit is required for any construction that disrupts City-owned streets, curbing, sidewalks, etc., <br />residential includes churches and schools. <br />Residential R-1 or R-2 Driveway $45 <br />Residential R-3, R-4 and R-5 Driveway or Parking Lot $75 <br />Residential Gravel (refer to Zoning Code for limitations) $25 <br />Commercial/Industrial Driveway or Parking Lot $150 <br />Commercial/Industrial Sidewalk or Patio $75 <br />Fence/Kennel – 7’ or below (if higher, Building Permit, see <br />Appendix A) <br />$30 <br />Retaining Wall – 4’ or below (if higher, Building Permit, see <br />Appendix A) <br />$30 <br />Shed (200 square feet or less) $30 <br />Signs – Billboards (Building Permit) See Appendix A <br />Signs (Chapter 1008) up to 100 square feet $75 <br />Signs 100 square feet or over $95 <br />Signs – Re-Facing or Altering $40