Laserfiche WebLink
2026 Mounds View Fee Schedule Page 6 of 16 <br />Signs, Banners – Temporary $40 per 21-day period (Limit 4 permits per year <br />plus one additional permit for a banner) <br />Swimming Pools, Residential (Above Ground) $30 <br />Swimming Pools (In-Ground, Building Permit) See Appendix A (Surcharge Required) <br />II. OTHER INSPECTION / PLANNING FEES <br />Applicants are responsible for all costs incurred associated with the filing, review and processing of <br />development applications. Such fees are to be paid in escrow up front or upon receipt of statement from the <br />City of Mounds View. Fees may include, but are not limited to, costs for consultants retained by the City, <br />consultant planning services, attorney, and engineer fees. A deposit may also be required to cover costs of <br />public notices, materials and staff time spent on the review, research or preparation of materials associated <br />with each application. The applicant shall be responsible for all reasonable costs incurred in excess of the <br />initial fee and/or deposit amount. Any portion of the deposit not spent or encumbered shall be refunded to the <br />applicant within 30 days after consideration of the application is completed. Payment of any park dedication <br />fees shall be made by the applicant after final plat approval. Application fees are not refundable. <br />Building Inspections Conducted Outside Normal Business <br />Hours <br />$63.25/hour (two-hour minimum charge) <br />Change of Address $150 <br />Change of Occupancy $75 <br />Comprehensive Plan Amendment $500 <br />Conditional Use Permit, R-1 or R-2 $400 <br />Conditional Use Permit, All Other Districts $400 <br />Conditional Use Permit Amendment Same as CUP Fee <br />Contractor License (Title XV, Chapter 150.053)) $60 <br />Contractor State License Verification Fee $5 per permit <br />Development/Site Plan Review $400 <br />Escrow – Manufactured Homes $500 per permit <br />Escrow – Occupancy (Seed, sod, landscaping; as-building <br />grading survey; driveway installation; curb cut <br />modifications; site clean-up; stormwater management; <br />drainage features; site erosion; right-of-way restoration; or <br />any other items as determined by the Building Official) <br />$1,000 for each item <br />Escrow, Planning (actual charges) $2,500 - $10,000 <br />Housing Inspection Initial and One Follow-Up (includes no <br />shows) <br />No Charge (Title XI, Chapter 119) <br />Housing Inspection/No Show, each additional $100 <br />Interim Use Permit (IUP) $400 <br />IUP Amendment $400 Same as IUP <br />Park Dedication Fees Residential: $3,500 per unit <br />Non-Residential: Up to 10% of estimated market <br />value (of land) <br />Plan Review (Payment Required Before Plans are <br />Reviewed) <br />65 percent of permit fee for all commercial permits <br />and for residential permits for new dwellings, <br />dwelling additions, garages, garage additions, <br />decks, sheds over 200 square feet, and major <br />remodeling. <br />Plan Review for Changes, Revisions, or Additions to Plans $47/hour (one half-hour minimum charge) <br />Plan Review, Engineering (Applicable to any project that <br />changes the grade. To be determined by Staff during <br />application review). <br />$100 per permit <br />Plan Review for Outside Consultants for Plan Checking <br />and Inspections or Both <br />Actual costs including administrative and <br />overhead costs <br />Plan Review Similar (all units are same or similar) Each unit after the first shall be 25% or original <br />fee