|
Plumbing Inspection Permit, Residential and Comme!"Larger
<br /> Minimum $60 or 1.25% of Valuation, whichever is
<br /> State Surcharge Required, See Appendix B
<br /> Plumbing Permit Plan Review, Commercial
<br /> Plumbing system plans and specifications that are submitted to the City of Mounds View for review shall be
<br /> accompanied by the appropriate plan examination fees shall be paid prior to plan approval. The City of Mounds
<br /> View shall charge the following fees for plan reviews and audits of plumbing installations for public, commercial,
<br /> and industrial buildings:
<br /> 1. Systems with both water distribution and drain, waste, and vent systems and having:
<br /> a. 25 or fewer drainage fixture units, $150
<br /> b. 26 to 50 drainage fixture units, $250
<br /> c. 51 to 150 drainage fixture units, $350
<br /> d. 151 to 249 drainage fixture units, $500
<br /> e. 250 or more drainage fixture units, $3 per drainage fixture unit to a maximum of$4,000; and
<br /> f. Interceptors, separators, or catch basins, $70 per interceptor, separator, or catch basin design
<br /> 2. Building sewer service only, $150
<br /> 3. Building water service only, $150
<br /> 4. Building water distribution system only, no drainage system, $5 per supply fixture unit or $150,
<br /> whichever is greater
<br /> 5. Storm drainage system, a minimum fee of$150 or:
<br /> a. $50 per drain opening, up to a maximum of$500; and
<br /> b. $70 per interceptor, separator, or catch basin design
<br /> 6. Manufactured home park or campground, one to 25 sites, $300
<br /> 7. Manufactured home park or campground, 26 to 50 sites, $350
<br /> 8. Manufactured home park or campground, 51 to 125 sites, $400
<br /> 9. Manufactured home park or campground, more than 125 sites, $500
<br /> 10. Revision to previously reviewed or incomplete plans:
<br /> a. Review of plans for which the city has issued two or more requests for additional information, per
<br /> review, $100 or ten percent of the original fee, whichever is greater
<br /> b. Proposer-requested revision with no increase in project scope, $50 or ten percent of original fee,
<br /> whichever is greater
<br /> c. Proposer-requested revision with an increase in project scope, $50 plus the difference between
<br /> the original project fee and the revised project fee---
<br /> Zoning Permits No Surcharge) Title XV, Chapter 150.050(C)(2)
<br /> Technology Fee 1 $3 per permit
<br /> Patio/Deck 30" and under, or not attached 1 $30
<br /> Driveways, Sidewalks, Parking Lots, Patios (no permit required for sealcoating or overlays without expansion).
<br /> A right-of-way permit is required for any construction that disrupts City-owned streets, curbing, sidewalks, etc.,
<br /> residential includes churches and schools.
<br /> Residential R-1 or R-2 Driveway $45
<br /> Residential R-3, R-4 and R-5 Driveway or Parkin Lot $75
<br /> Residential Gravel refer to Zoning Code for limitations $25
<br /> Commercial/Industrial Driveway or Parkin Lot $150
<br /> Commercial/Industrial Sidewalk or Patio $75
<br /> Fence/Kennel — 7' or below (if higher, Building Permit, see $30
<br /> Appendix A)
<br /> Retaining Wall —4' or below (if higher, Building Permit, see $30
<br /> Appendix A
<br /> Shed 200 square feet or less $30
<br /> Signs— Billboards (Building Permit See Appendix A
<br /> Signs (Chapter 1008 up to 100 square feet $75
<br /> Signs 100 square feet or over $95
<br /> Signs — Re-Facing or Altering $40
<br /> 2026 Mounds View Fee Schedule Page 5 of 16
<br />
|