My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 2025/10/27
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2020-2029
>
2025
>
Agenda Packets - 2025/10/27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2026 10:09:35 AM
Creation date
11/13/2025 2:59:58 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
10/27/2025
Description
Regular Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Illicit Discharge Fee To be determined by the Public Works Director on a case- <br /> by-case scenario. <br /> Stormwater Management (The permit fee schedule adopted 1210�'rT 12/14/2024 by the Rice Creek Watershed <br /> District Board (Resolution 2024-01). The fee for a permit is the cumulative total of all individual aspects of a <br /> project. Government entities are exempt from the permit fees). <br /> Rule C Stormwater Management): <br /> Residential, Commercial, Industrial, Institutional $3,000 non-refundable fee due at time of application. <br /> development that proposes less than 5 acres of new Once application review costs (District Engineer and <br /> and/or reconstructed impervious surface Legal Counsel) exceed $9,000*, any additional cost <br /> must be reimbursed by the applicant before the permit <br /> can be issued. <br /> Residential, Commercial, Industrial, Institutional $5,400 non-refundable fee due at time of application. <br /> development that proposes 5 or more acres of new Once application review costs (District Engineer and <br /> and/or reconstructed impervious surface Legal Counsel) exceed $9,000*, any additional cost <br /> must be reimbursed by the applicant before the permit <br /> can be issued. <br /> Notes: An application subject to a Rule C fee is exempt from the Non-Rule C fee of$300. <br /> The following is exempt from the Rule C fee and subject to only the Non-Rule C fee of$300: Single-family <br /> residential subdivision that creates seven or fewer lots and establishes no new public roadway or a private <br /> roadway/driveway roadway/driveway serving three or more lots <br /> Non-Rule C Fee: A $300 non-refundable fee is due at the time of application for a project subject to one or <br /> more of the following Rules: <br /> Rule D (Erosion and Sediment Control Plans) <br /> Rule E (Floodplain Alteration) <br /> Rule F (Wetland Alteration) <br /> Rule G (Regional Conveyance Systems) <br /> Rule I (Public Drainage Systems) <br /> Rule J (Appropriation of Public Waters <br /> Rule L (Variances): I Variable. See District Permit Variance Guidance Policy <br /> * Review cost is calculated according to the consultant hourly rate, which the district will publish annually. The <br /> review cost incurred between the non-refundable fee amount and $9,000 will be absorbed by the district and <br /> will not be the responsibility of the applicant. District staff will notify the applicant of the cost incurred to date <br /> once the total review cost exceeds $7,500, and at subsequent $3,000 intervals. A delay in notice, however, will <br /> not affect the applicant's reimbursement responsibility <br /> Stormwater Connection/Re air/Disconnect $4-99 150 plus surcharge <br /> Stormwater Inspection or re-inspection after Call-out rate per visit (Minimum 2 hours) <br /> hours. Percolation tests during work hours only. <br /> Street Lighting Utility Fees Title XV,-Chapter 152.018 <br /> Residential (single family homes, duplexes, $5.25 per unit per quarter <br /> fourplexes, condominium and townhomes <br /> Commercial/Industrial $24.58 per acre per quarter <br /> Institutional/Charitable $24.58 per acre per quarter <br /> Apartments $24.58 per acre per quarter <br /> Construction Site and Land Disturbance Fees (Title XV, Chapter 156.006) Additional Fees May be Required for <br /> Legal and Engineering Costs Incurred by the City. <br /> 50 to 1,000 Cubic Yards $150 <br /> 1,001 to 10,000 Cubic Yards $250 base fee plus $35 for each 1,000 cubic yards <br /> 10,001 to 100,000 Cubic Yards $500 base fee plus $100 for each 10,000 cubic yards <br /> 100,001 Cubic Yards or More $1,500 base fee plus $250 for each 100,000 cubic yards <br /> Other Miscellaneous Public Works Fees <br /> 2026 Mounds View Fee Schedule Page 16 of 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.