My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 2026/05/11
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2020-2029
>
2026
>
Agenda Packets - 2026/05/11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2026 12:13:49 PM
Creation date
5/14/2026 1:49:41 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
5/11/2026
Description
Regular Meeting
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
464
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Li viIr-J <br /> a it <br /> G R O U P <br /> 2.0 Summary Analysis / Narrative: <br /> 2.1 Introduction: <br /> This stormwater management report accompanies the Civil Engineering Plans prepared by Civil Site Group for <br /> the subject project dated 03/23/2026 and serves as attachment D to the storm water pollution prevention plan <br /> (SWPPP). This report includes a summary of the existing and proposed site conditions, the stormwater <br /> requirements of relevant regulatory agencies, and proposed design calculations and data to meet the <br /> requirements. <br /> 2.2 Existing Site Conditions: <br /> Site Description: <br /> The existing site is currently a church site with a wooded area and a wetland. The existing site surface <br /> coverage areas are shown in the table below: <br /> Drainage Area Impervious Area Pervious Area Total Area <br /> Area[SF] CN Value Area[SF] CN Value Area [SF] CN Value <br /> EX1 (TO EX WETLAND) 5979 98 147145 80 153124 81 <br /> EX2(TO LONG LAKE RD) 0 98 4047 80 4047 80 <br /> EX3(TO EAST) 0 98 302 80 302 80 <br /> EX4(OFF-SITE TO EX.WETLAND) 42,086 98 13701 80 55787 94 <br /> Existing Soils: <br /> A geotechnical evaluation has been completed for the project by Kilo Engineering on 12/30/2025. The report <br /> notes that due to the density of trees, they were not able to get boring equipment into the site, thus hand <br /> auger holes were used to analyze the soils. The auger depths went to a maximum of 5 ft below existing <br /> grade. Within that 5 ft, soils were found to be considered HSG "A". Due to the proximity to the existing <br /> wetland, and the proposed stormwater features being at a lower elevation that the lowest hand boring, we <br /> conservatively designed using "D"soils. We recommend that during construction the Geotech engineer <br /> examine the soils with either a new boring or test pit to determine that the soils are further down. If they are in <br /> fact"A", then we will amend our permit documents to incorporate the better soils. <br /> Groundwater: <br /> Groundwater was not identified in the geotechnical exploration. <br /> 2.3 Proposed Site Conditions: <br /> Site Description: <br /> The proposed site is a lot split of the parcel with the existing church as one lot and a new senior living facility <br /> on the other lot. The senior living site will include parking, landscaping, and two aboveground stormwater <br /> filtration basins. The proposed site surface coverage areas are shown in the table below: <br /> Drainage Area Impervious Area Pervious Area Total Area <br /> Area[SF] CN Value Area[SF] CN Value Area [SF] CN Value <br /> PR1A (TO EX WETLAND) 0 98 73524 80 73524 80 <br /> P R 1 B (TO FIL BASIN 1) 22963 98 16438 80 39401 90 <br /> PR1C(TO FIL BASIN 2) 23783 98 14659 80 38442 91 <br /> PR2(TO LONG LAKE RD) 1396 98 4408 80 5804 84 <br /> PR3(TO EAST) 0 1 98 302 1 80 302 1 80 <br /> P R4(OFF-SITE TO FIL.BASIN 2) 41270 1 98 14517 1 80 55787 1 93 <br /> Civil Site Group, PC • 5000 Glenwood Avenue ° Golden Valley Minnesota 55422 <br /> vw✓w.CivilSiteGroup.com ° (612)615-0060 <br />
The URL can be used to link to this page
Your browser does not support the video tag.