HomeMy WebLinkAboutMinutes - 1963/07/22Present were:
Mayor:
Clerk:
Trustee:
Absent:
Trustee:
PROCEEDINGS OF THE VILLAGE COUNCIL
VILLAGE OF MOUNDS VIEW
RAMSEY COUNTY, MINNESOTA
The regular meeting of the Mounds View Village Council was
called to order by Mayor Crane at 8:20 P.M., July 22, 1963 at 2401
Highway 10.
Also present:
Attorney:
Engineer:
Adm. Clerk:
Public Works:
Building Inspector:
Allan B. Crane
Lloyd J. Blanchard
John L. Sullivan
Donald C4 Hodges
Perry Malvin
Richard Meyers
Les Knutson
Paul E. Boog
Walter Skiba
Chris Piehowski
0J0082
Motion by Hodges to accept minutes of July 8, 1963 as
presented. Seconded by Crane. 4 Ayes.
Minutes of July 15, 1963, corrected as follows:
Page 1, Paragraph 2, Line 1 to read Mayor Crane re- opened the
Mueller Addition Project 1963 -1."
Motion by Sullivan to approve minutes of July 15, 1963 as corrected.
Seconded by Hodges. 4 Ayes.
The Mayor gave a brief report on progress of Sanitary Sewer
in the Village and presented a list of twelve items or statements
of intent of the Council.
Motion by Crane to adopt the following preliminary policy
statements regarding sanitary sewers and to request consultants to
continue feasibility study accordingly. The policy statements
are preliminary only and may be changed after further studies are made
and public hearings are held.
1. One hearing will be held on the main interceptor system
and three seperate hearings will be held on lateral system.
2. An area assessment will be made to cover cost of
Main interceptor (except as noted in three below) lift stations;
street replacement; maintenance building; storm sewers; machinery.
3. A front foot assessment will be made for lateral service
including that portion of main used as lateral.
3 -A.A service charge will be made for connection between
lateral and lot line.
4. A quarterly service charge will be made for lateral
maintenance and operation. This will be in addition to the quarterly
charge made by NSSSD.
5. Assessments may be paid in full after adoption of roll or
may be spread on tax rolls for up to 30 years.
6. Original bond issue will be short term(2 years) then
total cost will be refinanced after all work is completed and total
costs known.
7. Service will be made to a residence at the street not
at the back lot line.
8. House connections to curb outlet must be made without
90 degree angles.
-2- 0jfj083
9. Existing septic tanks and cesspools must be pumped
and filled.
10. Streets will be replaced with a four or five ton load
capacity, 31 feet wide and the boulevard will be filled with black
dirt and seeded from curb to existing lawn or the lot line, where
disturbed by construction.
11. Private driveways will be replaced if damaged by sewer
or street construction.
12. Storm sewers will be built when necessary to benefit
the sanitary sewer during or after construction, or when necessary
to provide proper street replacement. Seconded by Blanchard.4 Ayes.
A resident appeared regarding a complaint on ordinance
violation regarding stabling of horses. Upoh advise from the Attorney
he was advised to submit an application for a special use permit. If
permit is received by the Village Clerk prior to July 27, 1963, Police
Department will be notified to withold action pending the result of
a public hearing.
Mr. Malvin will check on other horse owners in the Village.
Mr. Hodges presented petitions for street lights. Motion
by Blanchard to send work order to N.S.P. to install one 6,000 lumen
lamp at Jackson and Terrace Drive intersection. Seconded by Hodges.
4 Ayes.
Motion by Hodges to send work order to N.S.P. to install
one 10,000 lumen lamp at County Road H -2 and Spring Lake Park R
intersection. Seconded by Crane. 4 Ayes.
The matter of the surplus peat on the Village park was brought
up and discussed. Mr. Knutson Engineer, informed the Council that he
has had repeated promises from the Contractor as to the fast removal of
this surplus but little action. Mr Knutson then presented Estimate 3
for the Hillview Project. Motion by Blanchard to accept Estimate 3
for the Hillview project but to withold payment pending further
Council action. Seconded by Crane. 4 Ayes.
Motion by Blanchard that the surplus peat on Oakwood Playground
and surrounding area, left from the Hillview road project will be stored
or stockpiled on the Greenfield playground, with the exception of that
amount needed for Hillview Park and the Village Hall site.
Seconded by Hodges. 4 Ayes.
Mayor Crane presented a letter regarding the location of 4
utility poles and requesting that they be lowered to conform with
'!e development to the South. (Copy of letter on file with original
minutes.)
A Representative of Bell Telephone explained why they feel
the developer should pay for this change.
Motion by Crane to send copies of this letter to Bell
Telephone, Northern States Power, and to Mr. McCubrey at State Highway
Department. Seconded by Blanchard. 4 Ayes.
The Mayor reported that Sgt. Rustad of the Police Department
was in the hospital with a suspected heart attack.
Motion by Crane to authorize expenses up to 550.00 for
'lage participation in the New Brighton Old Timers celebration as
,:rt of the Village recreation program. Seconded by Blanchard. 4 Ayes.
-3-
QJOG84
Mr. Malvin will be in charge of this activity and enlist
the aid of the Police Department and Civil Defense Department.
Motion by Crane to authorize the absence of the Deputy Clerk
Ph the Duty Police Officer and Mr. Skiba for two hours per day for five
days to attend the Civil Defense school in New Brighton. 4 Ayes.
Seconded by Hodges.
The Mayor announced the formation of a three member
Citizens Advisory Committee on Civil Defense and requested volunteers
for the job.
Motion by Blanchard to allow the firm of Comstock and Davis
to do Engineer work for the proposed trailer park at Hillview and
Highway 8, providing that Village consultant, Les Knutson,does
not do this work. Seconded by Crane. 4 Ayes.
The Attorney will prepare a resolution regarding the
acceptance of the City of St. Paul into the Ramsey County League.
The relocation of the New Brighton dump was referred to Mr.
Malvin for study and a report.
The Minutes of the Planning Commissinn Meeting of July 17,
1963 presented by Mrs. Blanchard, secretary of Planning Commission.
Motion by Crane to concur with the Planning Commissions
recommendation and approve the location and layout of the two apartment
buildings requested on the Hillview Road side of the Montgomery Trailer
Park site.(according to plat on file, with the exception that future
street be made 50 feet wide and that all dimensions east of future
street be moved 20 feet easterly.) Seconded by Blanchard. 4 Ayes.
After much discussion and examination of plans:
Motion by Crane to authorize the Building Inspector to issue a building
permit for apartment near Groberg and Jackson when he determines plans
meet zoning ordinance and building code. The ten foot set back require-
ment for septic tanks is waived for this permit.
Seconded by Sullivan. 4 Ayes.
Motion by Crane to grant vAriance in front yard setback for
LeRoy C. Oelrich 8428 Eastwood Drive upon receipt of fee required.
Seconded by Hodges. 4 Ayes.
A recommendation for the condemnation of a home at 7887 Edge
wood Drive was referred to Chris Piehowski for action.
Mr. Skiba will continue to be utilized as an inspector but
only in case of an emergency.
The Clerk's Office is requested to send a letter of thanks
to the Village of Blaine for loan of water meters.
The Engineer presented Estimate 3 (final estimate) for
Layne Minnesota of pump equipment and Well 2.
Motion by Crane to accept Estimate 3 authorize payment
•nd enter into one year warrenty bond agreement.
Vir seconded by Blanchard. 4 Ayes.
An estimate for resurfacing walkways was referred t: M:.
Sullivan for reviewal.
-4-
0,
The Engineer will prepare a new sketch of the proposed
extension of County Road H, following section lines more closely
than on previous sketch and submit same to Council and County Engineer.
The Attorney presented a summary of Justice Court Cases for
the past 216 years for Council study.
The Ordinance to change election dates was presented and read
by the Attorney.
Motion by Blanchard to adopt Ordinance 102.
Seconded by Sullivan. 4 Ayes.
Motion by Crane o to t adopt b Resolution A Seconded Sullivan.
Motion by Sullivan to have the Clerk certify Resolution
and 133 and send copies to County Auditor. Seconded by Crane. 4 Ayes.
A Resolution modifying by Sullivan toad ptResolutions #e was
131.Seconded by Hodges. 4 Ayes.
A proposal to codify Ordinances was received and filed.
A notice will be sent to all departments and personnel
involved regarding the budget meeting, August 19, 1963.
The weed inspector will receive notices that he is not
empowered to hire any personnel for any purpose.
Motion by Blanchard to pay bills submitted totaling
$56,480.25. Seconded by Hodges. 4 Ayes.
Motion by Blanchard to approve licenses. (list attached)
Seconded by Hodges. 4 Ayes.
Motion by Blanchard to adjourn. Seconded by Hodges. 4 Ayes.
Meeting adjourned at 11:40 P.M.
Respectfully submitted
Lloyd J. Blanchard
Village Clerk
x
LICENSES APPRGVED
GENERAL CONTRACTOR
Erco, Inc. 3231 Central Avenue N.E.
Robert Eigenheer 8803 Polk Street N.E.
James Haluptzok 7801 Gloria Circle
.XCAVATING
Suburban Piping Excay. 688 Hiawatha Avenue
Clark Moore Excavating Box 392 Monticello, Minnesota
HEATING AND GAS INSTALLERS
Blaugas
Stu Rothgeber
Snelling Company
PLUMBING
ELECTRICAL
Bond Electric
Dymanyk Electric
GASOLINE SERVICE STATION
Long Lake "66" Service
S
Mena Plunbing
Doug Heffner
.15-
11300 Central Avenue N.E.
2265 Oakwood Drive
1400 Roblyn Avenue
8020 Jefferson St. N.E.
1642 Carrol Avenue
1500 Monroe Street
2501 Highway 10
512 Nicollet Building
0J0086