Loading...
HomeMy WebLinkAboutMinutes - 1964/01/14PROCEEDINGS OF THE VILLAGE COUNCIL VILLAGE OF MOUNDS VIEW RAMSEY COUNTY, MINNESOTA Pursuant to due call and notice thereof, a Public Meeting of the Village Council of the Village of Mounds View, Minnesota was held at the Village Hall, 2401 Highway 10, on January 14, 1964 at 8:05 P.M. for the purpose of holding a Public Hearing on the proposed construction of a sanitary sewer improvement system consisting of the following: 1. Surface drainage. 2. Building sanitary sewer system. 3. Rebuilding and resurfacing the streets. 4. Maintenance building and equipment to service system. The meeting was called to order by Donald Hodges, the Village Mayor, who introduced the following persons: Richard Meyers, Village Attorney, Al Anderson, Fiscal Agent, and John Sullivan, Ingram Rusted and Charles D. LaVaque (Mr. LaVaque arrived during the meeting), Village Trustees, Paul Boog, Adm. Clerk and Les Knutsen, Engineer, Comstock Davis The meeting was turned over to Richard Meyers who stated this was the fourth hearing scheduled, and read the Notice of Hearing in part as follows: for the proposed construction of a sanitary improvement consisting of sanitary sewer laterals and service con- nections to furnish sewer service to the properties described below as the properties to be assessed. The improvement includes a general street resurfacing program on the streets described within the area describ- ed below. The estimated cost of the above improvement is $1,201,000. The area proposed to be assessed for said improve ment will include all properties lying within an area bounded by a line running as follows: On County Road "H" from Fairchild Avenue to Pleasant View Drive (West Corporate Limits). A long the West Corporate limits from County Road "H" to County Road "J County Road J" from West Corporate Limits to Jackson Drive ex- tended (East Corporate Limits). On Jackson Drive extended (East Corporate Limits) from County Road J to Ardan Avenue. On Ardan Avenue from Jackson Drive to Long Lance Road. On Long Lake Road from Ardan Avenue to County Road "H -2" from Long Lake Road to Fairchild Avenue. On Fairchild Avenue from County Road "H -2" to County Road "H Notice of the hearing was published on two dates-- January 2 and January 9, 1964. 883 notices were sent out for this hearing to every available address including some based on water billings. Approximately 75 persons attended the hearing. Mr. Meyers gave a general review of the areas covered by the first, second and third hearings, as previously set forth in the minutes of )ecember 5, December 12 and December 19, 1963. This meeting, the fourth scheduled, covered lateral imp- rovements for the large lot areas north of Highway 10 and west of Long Lake Road, generally, and south of Highway 10, and west of Fairchild Avenue. This was the second hearing for the area on the grounds that complaints were received from people in this particular area who did not receive notices, or they were not in proper form. The rehearing was to correct any of -2- these deficiencies. Any parties not actually receiving written notices were asked to cc. forward and have their names recorded. None appeared. Mr. Meyers gave a short review of the history of the sewer improvement program, as was outlined in the December 19, 1963 hearing, for the benefit of those who were not at previous meetings. He stated the problem first arose in September of 1958, at which time it was brought to the attention of the Council. The Village was incorporated in this same year and they began the immediate investigation of possible outlets for a sewer system. Methods were discussed at that time, but there was no sewage outlet available. In 1959 there were numerous requests for consideration of either a sanitary sewer system or water, and the Council requested the Village Engineer to make a preliminary study for the Village. On July 28, 1959, Dr. Houle gave a report on the need for both sewer and water in the Village. Decision was made in favor of proceeding with the water. The Fall of 1959 was the beginning of the N.S.S.S.D. and the following villages met to form a district for the purpose of finding an outlet for sewage disposal, namely: Blaine, Brooklyn Park, Spring Lake Park, Fridley, Coon Rapids, and Mounds View. Brooklyn °ark has since left the district. -3- Fridley has decided to remain. He reviewed the negotiations with Arden Hills, which began in 1959, for an outlet through the Twin City Arsenal. In July of 1960 the Engineering Committee of the N.S.S.S.D. submitted a plan for drainage -five different methods were actually proposed -we accepted the first one, that of Minneapolis sewer collection. In September of 1960 the Village received a preliminary report for its own sewer system within the Village. In the meantime, negotiations were still going on with Arden Hills hoping for some means of an outlet. We had the approval for a sewage system but not the outlet. In February of 1961 the Village of Mounds View requested legislation to past the N.S.S.S.D. bill and it was passed in that year. This gave powers to actually build an interceptor system. In Nov- ember of 1962 we met with Arden Hills and Arsenal officials to discuss various means of hooking onto their system. In February of 1963 we made a formal request for a utility sales contract with the U.S. Army requesting that we be permitted to hook onto one of their sewer lines and we would pay them on a metered basis. In March of 1963 we wrote the Army again asking for an answer and on May 15, 1963, a letter was received by the Village of Mounds View from them denying an outlet for the Arsenal system. They gave as their reason a security problem. Meanwhile, we -4- were preparing plans with the N.S.S.S.D. which would provide us with an outlet. A contract has now been let to begin the main interceptor near Fridley. Ground is being broken for that this week. Other contracts are being let now. Mounds View has not signed the contract with N.S.S.S.D. as yet. This is a decision to be made by the Council. Spring Lake Park has signed the contract. Mr. Meyers emphasized that the subject for discussion was the construction of our internal system within the Village of Mounds View. The first general hearing was village -wide for the purpose of discussing the main interceptor system, the last two hearings (actually three) described the laterals running up and down the streets in front of the various properties. This fourth hearing covered the laterals for the area designated in the notice. He stated Mr. Knutsen, the Village Engineer, would give a brief resume of the technical data on this project and Mr. Anderson, the Fiscal Agent, would give an explanation of the methods proposed to finance this particular project. Mr. Meyers again stated the estimated costs for the pro- posed sanitary sewer, surface drainage and street improvement program would probably exceed $4,000,000 (the exact proposal figure being $4,419,126), providing the entire system is built. It is not known yet whether we will build whole or portions of it. He stated the three main items for discussion which are: -5- surface drainage, building a sanitary sewer system and re- building and resurfacing existing roads. Mr. Les Knutsen, Village Engineer, proceeded with a review of the technical data. He explained the maps on display illustrating the various phases of this construction. Soil samples were taken within the area and analyzed, and these were on display for those who wished to check them. He stated the Council had directed them to make an investigation in January of 1959. Illustrations by map showed the main interceptor system and the various collection points, and the proposed super high- way as it is now laid out for the area He stated that construction will have to be modified for the right-of-way the Minnesota High- way Department will take at that time. There will be no loss to the Village by any highway changes, should they occur. The third map showed the proposed drainage system and gave an explanation of the original requests for such a system to correct existing deficiencies in the Village. It is a system of ditches and conduit which will drain present low areas in the Village of surface waters. He stated the second real benefit, at the time of sanitary sewer construction, is tld it would pro- vide an outlet for the discharge of well- pointing water. A question was raised asking why this water could not be discharged through the sanitary sewer system. Mr. Knutsen stated that iL could be done for the present, but it would require -6- cleaning the lines selected for this purpose and once any portion of this line isin service, it would be costly to discharge well point water into the lines. This water would be metered and charged for accordingly. He explained that the system of ditches as proposed is not to be construed as a storm sewer system in the true sense of the word. They are merely to receive surface water drainage. The ditch system is divided into three districts somewhat similar to those of the sanitary sewer district. He mentioned that a question was asked at a previous hearing "Will it affect the water level of Spring Lake Mr. Knutsen replied that if the system is constructed, two districts south of Highway 10 would contain flow control centers so it could be stopped at these particular points and allowed to back up. Continuing with the discussion on drainage, Mr. Knutsen stated that the system itself, as proposed, would not correct every minor drainage problem in the district. It is designed to accommodate present and future development in the area. He reviewed the original three basic outlets considered- Twin City Arsenal, N.S.S.S.D. and the Rice Creek sewage treatment, the latter being denied by the Health Department. Mr. Knutsen explained that the internal system illustrated -7- by map would outlet at two specific points: Along County Road H extended, immediately west to Trunk Highwy 10 and secondly, along County Road H between Pleasant View and Knollwood. Certain of the construction features proposed for sanitary sewer construction are as follows: 1. Backcasting of the excavations. This makes it easier to maintain traffic and the safety features are esp- ecially attractive. 2. Alignment of the sewer lines, where it is necessary, has been laid to conform with future street patterns which the Council has unofficially adopted. 3. The matter of restoration of County roads and streets is also included and the cost is considered. Restor- ation of boulevards disturbed by the construction is also proposed and this would mean grading, spreading of top soil and seeding with grass -type seed. Mr. Knutsen again stressed the fact that the intent of the sanitary sewer improvement is to provide a minimum maintenance utility at the lowest possible cost. He continued the discussion with an explanation of the manner in which the Village proposed to restore street surfacing after the work is completed. It will be similar to that in Richfield, but going one stop further in that the blacktop surface would be sealcoated to provide a slightly more dense surface. He stated that the streets should be allowed to condition for one season before final surfacing and the County roads for two seasons. This would provide a much better quality street and road and be more economical for the Village. Restoration of the County roads -8- is by oral agreement with the County officials and an inventory will be made of the surfaces disturbed, the value will be de- termined and the portions to be borne by the Village and the County will be agreed upon at that time. The County will bear the cost of the betterment to meet their requirements. He further explained that a utility of this nature, tak- ing into consideration proper construction, probably can last for a period in excess of 50 years. Therefore, a maintenance program should be considered and would require certain equipment, such equipment not necessarily confined to sewer use. He pointed out the Village has the option of owning the equipment or con- tracting for it, the latter ultimately more expensive. Housing the equipment was the next item the Village re- quested investigated and he illustrated the proposed maintenance and storage building by map. Construction would be similar to the Mounds View Village Hall building. The proposed total cost of the project includes the cost of the building and equipment which would be paid for by assessment in part and tax levy. In closing, Mr. Knutsen stated he wanted to make two definite points -the construction is a proposed, not final, plan. The costs Mr. Anderson, the fiscal agent, would discuss were supplied, most generally, by their firm and they were estimates. Some increments were added for possible future needs -9- and the cost figures are good through the year 1966. Mr. Meyers made several more comments on questions which came up at previous hearings such as, "Why is this matter (sewer proposal) not put to election He explained, as in previous hearings, that State law now placed the responsibility with the Village Council for making the decision whether or not to go ahead with this project. The law requires certain hearings be held. The hearings are for explanation and airing objections. Written objections are also acceptable and will be recorded. He explained that verbal statements would be taken later in the meeting and those not wishing to express themselves orally would have the opportunity of signing their names to sheets designated "For" or "Against" the proposal. He explained the matter of easement requirements-- approxi- mately 100 are needed to complete the system. Appointments were scheduled at previously appointed times for those wishing to confer with the Village Attorney on the matter. Some persons have donated them, which is very helpful since the Village does not have a budget for the acquisition of easements at this time. They have tried to conform easements with future road plans and future needs of the Village. In reply to the questions asking how this improvement will be paid for and when will assessments begin, he stated if the Council approves the project, the assessment hearings -10- would probably be held some time in 1965 and the first install- ment on taxes would start in 1966. The Council may decide to have the assessment hearings early, but 1966 would be reasonable. Prepayment can be arranged for ahead of time. In reply to statements by some persons that this will be too large a money burden for them and they will let their land go for taxes, he stated that none have done so thus far. If any land is made available through delinquent taxes, it will be used for park purposes. Mr. Anderson, Fiscal Agent, of Juran Moody, passed out sheets to those attending the meeting giving a cost analysis of the proposed sewer improvement, surface drainage and street improvement plan (Copy attached). Be stated they were requested by the Council to make a financial analysis of the project defining the methods to be used for payment, including the operation and maintenance of it. They followed the generally accepted practices for this type of improvement in arriving at the costs. Basically, there are three main sources of revenue: 1. Special assessments. 2. Sewer rentals used for operation of the system and operation of maintenance facilities. 3. Tax levy. He,then took an example from the cost sheet and followed it through, explaining the individual costs comprising the estimated total figure. In closing he stated that anyone who wished to do so could ask him questions during a later question and answer period. Mr. Meyers resumed the meeting asking for any questions from the floor, which would be answered by the speakers. The following persons volunteered questions. Raymond W. Faricy, Attorney Minnesota Bldg., St. Paul, Minn. "Has the Health Department or Dr. Houle made any re- examination as to the sanitary sewer system since 1959 Mr. Sullivan replied that Dr. Houle made one check in a low land area of Twelve Oaks last summer. No correction could be made without sewer. Nothing has been done by the Health Dept. since 1959. Mr. Faricy also asked for a clarification of the ditch costs which was given by Mr. Knutsen. Joseph Stork 8016 Red Oak Drive "Did the same engineer make water and sewer estimates:" Answer: Yes Mr. Stork: Price much higher on sewer. Cannot afford_ Mrs. Samuel Fried 2069 Sherwood "What is the sequence of construction- -some interceptors, some laterals, or what Answer: Most likely as interceptor construction progressed, laterals could be added. Council will determine which interceptors will be built first, most likely based on the need. George Jackson 8300 Hwy. 8 "R to the interceptor, when will people find out about it in our area when some adjustment has to be made -12- due to a change in the plan of the super highway Answer: A definite establishment of highway right -of- way has to be determined first. As soon as highway ;plans are made, revisions can be made. Mr. Jackson: "Re interceptor, how come it has to be such a large size pipe Answer: Minnesota Health Department dictates diameter of pipe. Takes into consideration present and future needs as well. William Frits 8072 Long Lake Road "On estimating sewer rental charge of $4.00 monthly, is this based on the assumption there will be a total hook- up? Is rental fee going to be assessed against entire village or only those hooking up Answer: These are the maximum charges. If wrong, have to raise taxes. District portion of $4.00 figure is made "per hookup Mr. Frits: "What happens if service rendered to only portion of village? If cost tole same, who will pay for it? Answer: Cost based on pretty nearly 100% hookup. Further questions discussed were: "Elaborate on lift station and what areas are back -bound by them." "Are there any interceptor lines running through northern edge of Village Answer: No "In event sewer did go in, what are rules on hooking up? Is it mandatory? Answer: This has not been discussed as yet. "Do the numbers on area map showing District #1 and District #2 indicate priority Answer: No. Just a split in the district by large lots and smaller lots. "What is involved in dealing with the Government? I am not satisfied with the answers of the Village and Engineer on dealing with the outlet through Arden Hills. Is it a result of ill feelings with Arden Hills?" This was answered by Mr. Sullivan and Mr. Meyers who read the turndown letter dated May 15, 1963 from the Government denying an outlet through the Arsenal system. "If a property owner lives on the boundary of Fridley and Mounds View, how will it be determined whether they would hook up to Fridley, or would they have an additional sewer line going down their street Answer: Health Dept. has a given number of connections available for Fridley. -13- When that number is exhausted, which is possible at present, they would not be allowed to hook up to Fridley. "Over how many years' time is this cost to be spread Answer: 30 years. "Re cost of street improvements, is there a difference in cost of Village and County roads Answer: The cost difference to property owner would be the same. "Has Council made surveys how it would benefit the community? Any industry to move out if sewer available Answer: Nothing definite. Anticipated that sewer will open door. Mr. Meyers closed the general questioning period and asked for the expressions of verbal opinions, "for" or "against" sewer. OPPOSED: Mr. Raymond W. Faricy, in behalf of Donald Voge, Highway 8, Co. Rd. J Realize need for several areas. Request Council to give thought to limiting service to those areas rather than village -wide. Robert Hillyard 2166 Hwy. 10 Siegic tanks do work. Thinks Council should table whole thing. Meetings show majority "against Doesn't that do any good? Mrs. E. B. Warner 8295 Red Oak Drive Cost too high. Lives all alone. George Jackson 8300 Highway 8 Opposed to it. A. C. Holtz 2655 Woodcrest Drive Thinks it is too soon. Joseph A. Stork 8016 Red Oak Drive kmo, Opposed to it. Can't pay. -14- August Mueller 8140 Eastwood Road Can't pay for it. Mrs. Felicia Leitz 7092 Pleasant View Drive Too costly. William Frits 8072 Long Lake Road A11 meetings held so far show majority opposed. How much will this cost the school district? Net result- opposed. Roger Bye 1936 Co. Road I Why not ask each individual home owner what he wants? Robert H. Eickstadt 2155 Sherwood Road Since Council is representative of the people, let people vote. Abner Jones 7966 Eastwood Dr. Not opposed not in favor of it. Know it is inevitable. Is there any provision for dividing up larger lots? IN FAVOR: Gaines T. Scherma 2077 Pinewood Drive In favor of it. Mrs. Florence Peterson 2277 Knoll Drive In favor. This brought to a close the verbal expressions "For" and "Against The following persons signed their names in OPPOSITION to sewer: Fred D. Allen Samuel B. Fried Arlene M. Fried -15- 8431 Groveland Rd. 2069 Sherwood from: mk 1/25/64 Dwain Kinkel Swen Theilin Byron P. Draxten Harper I. Pabst Wm. Werner Roy Juntunen Willard J. Downing D. D. Wendt Lloyd Remmers Roger D. Bye Carl B. Fisher Howard W. Thomsen Harold F. Glaser Frank Gabrysh Conrad J. Wilson Joseph A. Stork Robert H. Eickstadt Two letters were received by the Village opposing sewer Mrs. Philip Palmer 8360 Eastwood Rd. Matt Moliers 1925 Woodale Dr. A petition was also received at this meeting signed by 143 persons FAVORING sewer improvement. These people live in the area from Highwy #8 to the East, to Jackson at West, Oakwood on the North and to County Road H -2 at the South. There being no further discussion, the meeting adjourned at 10:20 P.M. Respectfully submitted, Llfbyd -16- 2464 Ridge Lane 7237 Knollwood 7226 Knollwood 7745 Eastwood 2101 Sherwood Rd. 2114 Sherwood Rd. 7885 Sunnysid Rd Spring Lake Road 8065 7474 Groveland 1936 Co. Rd I 7457 Pleasant View Dr. 7425 Pleasant View D 7820 Eastwood Drive 2088 Count J. 7877 Sunnyside Rd. 8016 Red Oak Dr. 2155 Sherwood anchard, Village Clerk