HomeMy WebLinkAboutMinutes - 1969/09/150 An assessment hearing for Water and Sewer Improvement Project 1968 -2 and Street Improvement Project 1969 -1 was called to order by Mayor Rustad at 7:05 P.M. on Monday, September 15, 1969, at the Village Hall, 2401 Highway #10, St. Paul, Minnesota 55112. Present: Mayor Rustad Councilman Malvin Councilman Johnson Councilman Hodges Councilman Blanchard PROCEEDINGS OF THE VILLAGE COUNCIL VILLAGE OF MOUNDS VIEW RAMSEY COUNTY, MINNESOTA SEPTEMBER 15, 1969 Also Present: Clerk- Administrator Zylla Attorney Meyers Engineer Boehm Inspector Skiba Clerk Zylla read the legal notice and attested to its publication in the New Brighton Bulletin September 4th and llth. Lands included in the assessment hearing were Lots 1 10 Block 1 and Lots 1 15 Block 2 ParkvView Terrace, Parcel #s 59 -0080- 130 -29 and 59 -0080- 110 -29. In addition lands added to this assessment role but not in this project included: 1. 59- 0080 030 -54 Edgewood Jr. High 2. Tract G Registered Land Survey 153 3. 59- 0080 040 -79 2260 Highway #10 4. W 120' of Lot 20 Woodlawn Terrace Bernhard LeVander, attorney, representing Independent School District #621 appeared stating he wishes the Districts objection to a water assessment under Project 1967 -5 recorded in the minutes. Edgewood Junior High School was assessed 938' at $4.35 per lateral foot along the N side of their property. District #621 feels there is no benefit to them. Needs are satisfied by water on the W side of the property. A letter was presented to the Mayor objecting to the assessment. Douglas Johnson of Rocket Development objected to the proposed assessment of Parcel 130 -29. Stated he was told informally by someone that if he connected and took access off of County Road I he would not be assessed on Woodlawn. A letter was presented to be a part of the aecord. Mayor Rustad called for further objections. There were none. Clerk Zylla noted that the assessment proposed against the W 120' of Lot 20 Woodlawn Terrace was paid by Mr. Lawrence Erickson before the hearing. Assessment resulted from a lot subdivision which Mr. Erickson had refused to pay. Clerk Zylla also noted that the improvements considered in Park View Terrace were petitioned for in March of 1968 and the petitioners then requested the assessment be spread over a five year period. Mayor Rustad closed 'he hearing at 7:25 P.M. Decision postponed until September 22nd. A Special Meeting was then called to order by Mayor Rustad at 7:26 P.M. Present: Mayor Rustad Councilman Malvin Councilman Johnson Councilman Hodges Councilman Blanchard Mr. William Werner, 2101 Sherwood Road, desired information on whether any of his land would be taken for Fairchild Avenue next to Eigenheers 4th Addition. Engineer Boehm stated that the project was feasible without disturbing Mr. Werner's property. Discussion on street width ensued. Mr. Werner has a wildlife refuge on the north side of his property that he wants preserved. MSP (Blanchard /Johnson) That the Village Council of Mounds View will not authorize the taking, touching, or disturbing of Mr. Werner's property in any way for Project 1969 -4 and the related street project, nor will they seek permanent or temporary easements. Engineer Boehm reported bids were opened at 12 noon on Project 1969 -4. Engineer stated that the low bid was about 1/3 higher than estimated but he felt his estimate was a little low. He also felt to readvertise would cause the bids to be higher the second time if the bidders felt they bidded in good faith the first time. MSP (Blanchard /Hodges) To accept the bids for Project 1969 -4 and to award the bid to the lowest responsible bidder, Randall Brothers $59,000.00. PLANHOLDER Walbon Excavating Company 3242 Highway #8 Minneapolis, Minn. 55418 Lametti Sons, Inc. Federal Ins. 2560 North Cleveland Avenue 10% St. Paul, Minn. 55113 Randal Bros., Inc. 3400 Silver Lake Road Minneapolis, Minn. 55418 Sandstrom Hafner, Inc. 7400 Highway #65 Minneapolis, Minn. 55432 2 Also Present: Clerk- Administrator Zylla Attorney Meyers Engineer Boehm Inspector Skiba SURETY LUMP SUM BID St. Paul $76,601.00 Farmers Mech. 10% Certified Check $59,000.00 $5,900.00 The Home Indemnity $64,100.00 Company 10% MSP (Malvin /Johnson) To adjourn at 7:40 P.M. $72,307.20 r espectfully Submitted, JI t Ltcc 9 d Dennis S. Zyil Clerk- Administrator 5 Ayes 5 Ayes 5 Ayes