HomeMy WebLinkAboutMinutes - 1973/10/09A Regular Meeting of the Mounds View Village Council was called to order by Mayor
Neisen at 8:14 P.M. on October 1 1973, at the Mounds View Village Hall, 2401
Highway #10, St. Paul, Minnesota 55112.
Present:
PROCEEDINGS OF THE VILLAGE COUNCIL
VILLAGE OF MOUNDS VIEW
COUNTY OF RAMSEY
Mayor Neisen
Councilman Hodges
Councilman Baumgartner
Councilman Johnson
Councilman Pickar
MSP (Hodges Baumgartner) To approve the minutes of September 24, 1973. 5 Ayes
MSP (Pickar- Johnson) To approve the minutes of October 1, 1973. 5 Ayes
Residents Requests and Comments from the Floor
Also Present:
Attorney Meyers
Engineer Comstock
Clerk Administrator Zylla
Robert Engwer, Business Manager of the Mounds View School District, notified the
Council that Red Oak School is overcrowded and School District officials are
seeking a solution to the problem. Probable solutions being discussed are either
a portable or mobile unit similar to a two section mobile home. As yet, the
district has made no decision but will reappear before the Council whenever they
reach an agreement amongst themselves. He added that a task force is presently
researching the long range problem of overcrowding.
William Biem, of P.B.K. Investment Company requested that the assessment placed
on the Mounds View Industrial Park in July 1973 be reapportioned. He stated that
he was out of the country when the hearing was held. Mr. Biem also questioned
the high cost per acre of the assessment.
Attorney Meyers explained under what conditions the Council may reassess improvements
noting also that the appeal time has elapsed.
Clerk Zylla stated that there may be a question of benefit on at least nine acres
of Lot No. 3 since the Ramsey County Open Space Commission feels that nine acres
are wet land and as such possibly only 20% may be filled. He also noted that
Ramsey County's cut -off date for recertification is October 10, 1973.
The Council was advised by Attorney Meyers, in discussing the benefits for the
property if it was reapportioned and additional assessments were later placed on
Lot No. 3, that the test of benefit is increase in market value.
Because of the question of future benefit if new assessments are necessary and a
possible appeal, the Council informed Mr. Biem that the assessment would stand.
MSP (Hodges Johnson) To recess the regular meeting at 8:35 P.M.
Mayor Neisen called the hearing to consider the vacation and transfer of easements
5 Ayes
-2-
in the Anchor Inn property to order at 8:36 P.M.
Council waived reading of the legal notice. Clerk Zylla noted that the notice was
published in the New Brighton Bulletin on September 27 and October 4, 1973. There
were no objections from the floor.
MSP Neisen- Johnson) To approve the vacation of the following easements contingent
on receipt of the new easement and the installation of the drainage pipe in the
new easement and that the installation be performed at the expense of the developer.
Parcel 060 -52, being the North 231 feet of the West 330 feet of the
Northeast 1/4 of the Southwest 1/4 of Section 8, Township 30, Range
23, in the Village of Mounds View, Ramsey County, Minnesota; subject
to roads and a drainage easement over the South 5 feet, and
Parcel 030 -52, the South 132 feet of the North 363 feet of the West
330 feet of the Northeast 1/4 of the Southwest 1/4 of Section 8,
Township 30, Range 23, in the Village of Mounds View, Ramsey County,
Minnesota; subject to roads and a drainage easement over the North
5 feet.
In exchange for the vacation, the Village will receive a 10' perpetual easement
for storm sewer purposes over, under, and across the following described property:
The South 132 feet of the North 363 feet of the West 330 feet of the
Northeast Quarter (NE 1/4) of the Southwest Quarter (SW 1/4) of Section
8, Township 30, Range 23, in the Village of Mounds View, Ramsey County,
Minnesota, except therefrom the East 30 feet and also the West 30 feet.
MSP (Hodges Pickar) To adjourn the special hearing at 8:40 P.M. 5 Ayes
Mayor Neisen called the special hearing to consider the drainage problem between
Sherwood Road and Laport Drive West of Jackson Drive to order at 8:40 P.M.
Clerk Zylla read the legal notice and attested to its publication in the New
Brighton Bulletin on September 22 and October 4, 1973. 17 notices were sent.
Engineer Cor:.Jtock summarized the improvement noting that drainage in the past was
by perculation, but increased runoff and development has caused a drainage problem.
The area is impracticable to fill. He suggested installing approximately 300 feet
of 12 inch conduit at an approximate cost of $2,100.00. (Project 1973 -6)
Peter Wiedemann, 2333 Sherwood Road, agreed there was a problem but opposed the
improvement because there was no direct or indirect benefit to him.
Bruce Lawson, 2332 Laport Drive, reiterated that there was no benefit and the
improvement was unjustified and ridiculous even though his water may contribute
to the drainage problem.
Attorney Meyers gave an explanation of benefits noting that benefit may accrue
even though one's property doesn't abut the improvement.
-3-
Lyle Nelson, 2357 Sherwood Road, stated that the problem was created by the builder
and that there should never have been a house built there.
Jim Reed, 2325 Sherwood Road, added that the builder disturbed the natural drainage
and it is not for the residents to pay.
Councilman Johnson asked Mr. Wallace, the petitioner for the improvement, whether
there would still be water there if he placed fill in his lot. Mr. Wallace
commented that he would still have water and that someone else would then have
a serious water problem.
Mr. Wiedemann reiterated that the builder created a problem and he asked how
benefits are determined.
Mayor Neisen explained that all those in the drainage boundary benefit. He added,
the high point of the ground determines the drainage boundary.
Judy Schreyer, 8120 Jackson Drive, said that Walter Skiba, the building inspector
told her the builder, Arvid Birkeland was to pay for the improvement. She added
that she was forced to sign an easement before she could get her building permit.
Engineer Comstock said that the Council is not here to promote a solution, rather
they have been asked to propose a solution to the problem.
Lyle Nelson said that the people in the area knew Mr. Wallace would have a problem.
Councilman Johnson asked whether the Village could take legal action against the
builder. Attorney Meyers felt that it may be tough to prove the Village's case,
and that the legal cost could equal the cost of the improvement.
Mr. Reed asked that the Council do something and not expect the homeowners to do
something.
Mr. Wiedemann said let the builder shoulder the cost.
Mr. Wallace said that he would fill in his lot if no action was taken but someone
else will have a problem if he does so.
Clerk Zylla explained the history of events leading up to the issuance of a building
permit to Mrs. Schreyer explaining that the drainage easement was signed of her own
free will.
Councilman Baumgartner suggested that Attorney Meyers talk to Mr. Birkeland noting
that he had given a verbal commitment to our building inspector to correct the
situation.
Councilman Pickar felt that the Council should order the improvement and proceed
to obtain the cost from the builder.
Councilman Johnson said that the builder wronged the residents and the Council
and he should be sued.
Mayor Neisen said if the builder is sued it should be by the residents of the area.
That this is a localized problem and that other Village taxpayers should not have
-4-
to pay the cost of a lawsuit.
Councilman Baumgartner declared that Inspector Skiba was in error by not getting
in writing Birkeland's commitment to correct the drainage problem.
Motion (Picker) To accept the Engineer's report and to proceed with the project
as scheduled. Motion died for lack of second.
Councilman Johnson suggested that either Birkeland puts the pipe in and pays for
it or the Village puts it in and assesses it.
MSP (Neisen- Hodges) To table the matter until October 23, 1973 at 8:30 P.M.
giving Attorney Meyers time to talk to Mr. Birkeland relating the Council's concern
for the matter and explaining to him that the Council feels the cost of the
improvement, whether it's installed by him or the Village, should be borne by Mr.
Birkeland. And that the Village will consider legal action against Mr. Birkeland
if the total cost of the improvement is not paid by him. 5 Ayes
MSP (Neisen- Johnson) To continue the hearing on October 23, 1973 at 8:30 P.M. 5 Ayes
Meeting temporarily adjourned at 10:08 P.M.
Mayor Neisen called the regular meeting back to order.
Mayor Neisen's Report
Mayor Neisen announced that filings for office closed today and Councilman Johnson
will be running unopposed for Councilman and he will be running unopposed for Mayor.
Mayor Neisen read the Police Report for September.
Clerk- Administrator Zylla's Report
MSP (Hodges Baumgartner) To approve the licenses: General Contractor Marvin's
Roofing, Russell Scott Construction; Heating Mill City Heating A.C. Co., Twin
City Furnace Co. 5 Ayes
MSP (Johnson- Hodges) To approve the bills: General Fund checks #7743 through
#7796, Payroll Account checks #1047 through #1049, Payroll checks #575 through
#599. Transfer check #7794 transferring $31.74 to the Payroll Account from the
General Account to correct transfer made in error on 7- 23 -73, and check #7795
transferring $10,065.38 to Payroll Acount to pay gross pay of October 15, 1973.
From General $7,911.74, from Water $1,368.92, from Sewer $784.72. Total
disbursements of $27,275.95. 5 Ayes
MSP (Johnson- Hodges) To approve the installation of two or three street lights
along County Road H in the vicinity of the Malvin, Pettibone, and Herbst offices. 5 Ayes
The Clerk was directed to send a letter to NSP requesting prompt installation of
the street lights in Red Oak Estates.
MSP (Pickar Hodges) To adopt Resolution No. 613 declaring ccr'ca_n lands non
conservation and requesting certain land previously forfeited be conveyed to the
Village of Mounds View. 5 Ayes
-5-
MSP (Johnson Baumgartner) To adopt Resolution No. 614 apportioning the assessments
on Division No. 46961. 5 Ayes
Clerk Zylla announced that he has received the signed agreement from Ramsey County
on the semiphore at Quincy Street and County Road 1. He has not received any word
as to when the installation will be made nor has he received any reply from School
District 621 on the proposed joint powers agreement for a skating rink on the
Edgewood School property.
MSP (Neisen Baumgartner) To allow the Village to furnish posts for the Mounds View
Snowmobile Club "Snowmobiling Laws Enforced" signs. 5 Ayes
MSP (Hodges Pickar) To authorize the Geo. M. Hanson Company to conduct the 1973
Village audit for a cost of between $3,400 to $3,600. 5 Ayes
Councilman Baumgartner's Report
MSP (Baumgartner Hodges) To approve the subdivision request for John Kelner to
divide Lot 1, Spring Lake Park Knolls Addition into the East half and the West
half thereof.
MSP (Baumgartner- Hodges) To authorize the issuance of a building permit for a
Crown Auto Store at the Northwest corner of Highway #10 and Sunnyside Road subject
to payment of a fee, approval of plans by Village inspectors, and approval of a
Highway #10 exit as per the Planning Commission's request.
MSP (Neisen- Johnson) To approve the issuance of a remodeling permit to Fedor's
Market at 5491 Adams Street to construct an 800 square foot addition.
Attorney Meyers was requested to investigate the status of Liberty Street in the
vicinity of Highway #10 and Highway Avenue.
Councilman Baumgartner reported that the Recreation Commission met on September
27, 1973.
MSP (Baumgartner- Hodges) To adopt Ordinance No. 203 describing the position,
duties, and qualifications of a Parks and Recreation Director. 5 Ayes;
Councilman Hodges' Report
ouncilman Hodges reported that he has received for Council review an agreement
from a community involved in a joint civil defense effort with another community.
He also added that the Mounds View Civil Defense Plan is almost completed.
Councilman Johnson's Report
MSP (Johnson Neisen) To accept with regret the resignation of James Schlichtmann
as public works superintendent leaving open at this time the effective termination
date.
MSP (Johnson Hodges) To direct the attorney and administrator to prepare an
ordinance describing the position, duties, and qualifications of a public works
director.
5 Ayes,
5 Ayesi`
5 Ayes';
5 Ayes
5 Ayes
-6-
MSP (Johnson Baumgartner) To authorize the start of the recruitment and selection
process for a public works director. The position to be filled approximately
January 1, 1974.
Councilman Picker's Report
Councilman Picker announced that the Lakeside Park Commission mgt o., September 26,
1973 at 1Which additional lighting for the pa:k was arranged and a tree planting
program was authorized. The next Lakeside Park Commission meeting is October 16,
1973.
Attorney Meyers' Report
MSP (Baumgartner-Johnson) To authorize Attorney Meyers to amend the Village
subdivision regulations relative to the taking of cash or lands for parks to
conform to the new State Law, giving the Village the option of determining whether
to accept cash or land. 5 Ayes
The Council is to discuss redefining what is a subdivision at their next meeting.
MSP (Neisen- Johnson) To adopt Ordinance No. 204 amending the Mounds View Snowmobile
Law relative to the hours of operation on Friday and Saturday evenings, changing
the hours of operation from 7 a.m. to 11 p.m. to 7 a.m. to 12 a.m. 5 Ayes
MSP (Johnson- Hodges) To direct the Mayor to sign the architectual contract with
Walijarvi and Associates if the contract is non contradictary with the letter
signed by Mr. Walijarvi and the Village prepared by Attorney Meyers dated October
lst.
MSP (Hodges- Baumgartner) To authorize the Mayor and Clerk to sign a quit claim
deed for the Willmus Properties easement relocation.
Engineer Comstock's Report
Engineer Comstock explained the drainage problem at Groberg and Jackson Drive noting
the cleaning of the ditch system could be performed for approximately $1,600.00 or
a pipe could be constructed at a cost of about $14,000.00. In any case, grades are
relatively flat and both above expenditures would only provide a temporary solution
to the problem of standing water at Groberg and Jackson.
MSP (Johnson- Hodges) To set an improvement hearing to consider a solution to the
drainage problem mentioned above for November 12, 1973 at 8:30 P.M.
MSP (Neisen Johnson) To approve addendum No. 1 to the preliminary report and cost
estimate for Project 1973 -4 extending the sanitary sewer from Ardan and Long Lake
Road north approximately 1,100 feet.
MSP (Johnson Baumgartner) To adjourn at 11:37 P.M.
Respecfully Submitted,
Dennis S. 40 a,
Clerk Administrator