HomeMy WebLinkAboutMinutes - 1974/02/25SPECIAL MEETING
CITY OF MOUNDS VIEW
RAMSEY COUNTY
A special meeting to consider the addition to and alteration of the
City Hall and alteration to the Public Works Building was called to order
by Mayor Neisen at 6 :30 P.M. on February 25, 1974.
Present:
Mayor Nelsen
Councilman Hodges
Councilman Baumgartner
Councilman Johnson
Councilman Pickar
Also Present:
Clerk- Administrator Zylla
Mayor Nelsen announced that notice of the hearing was published in the
rebruary City Newsletter and called attention to in stories written in the
New Brighton Bulletin and the St. Paul Dispatch.
Mayor Neisen introduced Mr. Kenneth Walijarvi, architect, who made the
presentation for the City to the approximate 15 persons in attendance.
Mr. Walijarvi explained that he was commissioned in October to work with
the Administrator in formulating a solution to the City's lack of space
problem. Based on his study, he found it more economical to remodel the
present structure and use it for police purposes, and to build an addition
onto the south of the existing facility which would house the Council chamber
and the new administrative offices, than to build new. A basement which
would serve as an emergency operating center would be planned under the
administrative offices and federal money would be sought to share in its
cost. The police department would move out from the existing public works
building and it would be remodeled for use exclusively by,public works.
Using an overhead projector, Mr. Walijarvi showed transparencies of the
addition and remodeling.
Mrs. Isabelle Wille, 7911 Spring Lake Road, asked if there was room for
expansion. Mr. Walijarvi replied that in addition to the basement area,
there was room to expand out from the administrative offices south toward
the highway.
Mr. Robert Glazer, 2375 Hillview Road, asked if the Council was planning
on holding a referendum. Mayor Neisen replied that a referendum was not
necessary since no bond issued was planned.
Mr. Walijarvi stated that the total construction cost of the upper level
including the remodeling for the police was $178,523.00. The estimated
cost of construction with lower level was $234,683.00. With fees and
contingencies, the total estimated cost of the project without lower level
came to $210,657.00, with lower level $276,926.00.
Councilman Donald Hodges arrived at 6:50 P.M.
-2-
Administrator Zylla explained that there has been two meetings with the
Federal Civil Defense staff and that the City is requesting that the
federal government participate in the basement cost in the amount of
$53,240.00.
Mr. Gene Skiba, reporter for the New Brighton Bulletin, asked if library
space will be provided. The Administrator explained that he had spoken
to someone from the Library previously while the project was in preliminary
planning stages and that a follow -up contact will be made with library
personnel.
Nancy Burmeister, 7565 Knollwood Drive, asked what was the construction
schedule. Mr. Walijarvi explained that it takes three to four months for
plans, one month to bid, and approximately one month to get contracts signed
once they are awarded.
Mayor Neisen explained that the project is actually in three parts:
1. Construction of the new addition.
2. Remodeling of existing space at the City Hall.
3. Remodeling of the Public Works Building.
Mrs. Barbara Haake, 3024 County Road I, encouraged the Council to construct
the basement even if federal monies are not available.
MSP (Neisen Baumgartner) To direct the architect to commence work on the
preparation of final plans and specifications for the purposes of soliciting
contractor bids. 5 Ayes
Robert Glazer asked since no bonds were to be sold for this project, whether
or not bonds will have to be sold for some other project in the near future.
Mayor Neisen answered that thers are no plans for other bond issues at this
time. Councilman Baumgartner added that the City in determining their
priorities for capital improvements, had determined that this project was a
number one priority.
MSP (Baumgartner- Hodges) To adjourn at 7:29 P.M.
r espectfully Submitted,
LLC-
Dennis S. Zylla,
Clerk- Administrator
5 Ayes
PROCEEDINGS OF THE CITY COUNCIL
RAMSEY COUNTY MINNESOTA
A Regular Meeting of the Mounds View City Council was called to order by
Mayor Neisen at 8:00 P.M., on February 25, 1974 at the Mounds View City
Hall, 2401 Highway #10, Mounds View, Minnesota 55112.
Present:
Mayor Neisen
Councilman Hodges
Councilman Baumgartner
Councilman Johnson
Councilman Pickar
Mayor Neisen's Report
Also Present:
Clerk- Administrator Zylla
Engineer Bearden
Absent:
Attorney Meyers
MSP (Hodges Pickar) To approve the minutes of February 11, 1974.
Administrator Zylla's Report
MSP (Pickar-Johnson) To approve the licenses: Sewer Water Roseville
Plumbing; Peddler Solicitor Wilmur L. Menke.
4 Ayes
Johnson Abstained
Residents Requests and Comments from the Floor
With a few residents in the audience from the 8200 block of Spring Lake Road,
Engineer Bearden commented on the proposed location of the sewer main which
must extend from proposed PJ•asant View to Spring Lake Road, (Project 1973 -4).
It appeared that the routing of the main just south of 8248 Spring Lake Road
was satisfactory to those in attendance.
Mayor Neisen commented on a letter received from the League of Women Voters in
which they thanked the Council for hiring a park and recreation director.
MSP (Neisen Hodges) To approve the bills: General Fund checks #8245 thru #8276,
Payroll Account checks #1073 #1074, Payroll checks #874 thru #914, Transfer
check #8277 transferring $12,717.74 to the Payroll Account to pay gross pay
of February 28, 1974. From General $11,000.12, from Water $948.52, from
Sewer $769.10. Total disbursements $25,202.42. 5 Ayes
MSP (Neisen- Hodges) To approve Ordinance #209 adding Chapter 7 to the Municipal
Code defining the duties and qualifications of the Public Works Superintendent.
5 Ayes
Administrator Zylla announced that the fire department would be conducting the
fire flow test for the Harstad Townhouses on March 1, at 2:00 P.M.
Administrator Zylla noted that he and Walter Skiba had met with Mr. Neumann,
5 Ayes
architect for Paster Enterprises, and it appeared that they would be attending
the next regular Council meeting to request a reissuance of their building
permit for the shopping center planned at Highway #10 and Long Lake Road.`
Councilnian Johnson's Report
Councilman Johnson inquired whether or not information was being furnished to
the Metropolitan Council for their publicationcLata -log. He was concerned
because Mounds View was not mentioned in their most recent publication. The
Administrator informed the Council that he does provide the Metro Council
with the information they request for their publication.
Councilman Baumgartner's Report
Councilman Baumgartner announced that the Recreation Commission would be
meeting on the 28th of February and the Planning Commission on the 27th of
February. He was informed that Doug Bryant was seeking information for the
Council on House File 1525 and the Save Open Space Committee.
Councilman Picker's Report
Councilman Picker noted that the Lakeside Park Conn meeting scheduled
for last week was postponed.
Engineer Bearden's Report
Engineer Bearden informed the Council that the State of Minnesota has told
him that Highway Avenue is owned by the State and is not a municipal street.
MSP (Johnson Pickar) To adjourn at 8:24 P.M.
Mayor Neisen called the Regular meeting back to order at 8:58 Y.M. to consider
the issuance of a special use permit to construct a motor freight terminal in
the Mounds View Industrial Park. The hearing was continued from February llth.
Reuben Johnson, architect for Buetow and Associates, made the presentation on
behalf of Smith's Transfer Corporation. He noted that he had met on two
occasions with the City staff to discuss the proposal. He felt that there
was a problem with the initial site plan of February llth because of an
interpretation of "front yard
The site plan that he presented included a 40 foot setback as required by
ordinance. The setback to consist of a completely landscaped area with grass
and trees and a berm. The architect is proposing no cross traffic in the
front of the building.
The area to the rear of the lot which adjoins Towns Edge Terrace Mobile Home
5 Ayes
-3-
Park would also have a landscaped berm with trees.
Mr. Johnson felt that the City is interpreting "front yard" to mean the area
from the front of the building line to the property line and, that his
interpretation was that the "front yard" consisted of the area between the
property line and the building setback line. If his definition was correct,
then no variance for front yard parking would be necessary.
Mr. Johnson noted that the area between the bl,::ktop terminal lot and the
mobile home park would be seeded. He added upon a question by the Administrator
that the front of the building could be redone at no increase in cost to make
it more esthetic and that Smith's Transfer would be willing to accept such a
stipulation in the special use permit agreement. Mr. Johnson said Smith
Transfer was willing to agree to all conditions specified at the February llth
meeting.
Councilman Johi.son was concerned about sleeping quarters on the second floor.
The architect assured the Council that these quarters were strictly for
Smith's Transfer drivers.
Councilman Pickar asked if there would be a curb within the property around
the parking area. Mr. Johnson stated that it would probably be a bituminous
curb or precast concrete.
The height of the berm was estimated at four to five feet. lir. Johnson said that
there would be no vehicles stored in the seeded area on the property. The
Administrator suggested moving the gate to the seeded area over the City's
easement possibly avoiding obtaining a new easement to the west of this property ;l
in order to gain access to the water tower.
Councilman Johnson noted that when the special use permit agreement is prepared
it may contain more or less terms and conditions specified in the Council
minutes of February 11, 1974.
MSP (Neisen Pickar) To grant the special use permit to Smith's Transfer Corporation
to build a motor freight terminal on part of Lot 3, Mounds View Industrial. Park,
contingent upon the preparation and signature of a written special use permit
agreement with an attached final site plan. 5
MSP (Neisen- Hodges) To tentatively approve the site plan as presented on
February 25th, subject to its review and approval by the Planning Commission.
Planning Commission Chairwoman Mrs. Haake informed the Council that when the
Planning Commission approved the special use permit for Smith Trucking their
only review was that of the sketch plan and their approval did not mean the
approval of the site plan. They only were giving concept approval to the
motor freight terminal on the site.
MSP (Johnson- Baumgartner) To adjourn at 9:29 P.M.
espectfully Submitted,
ennis S. ZVlla,
Clerk- Administrator
5 Ayes;-
5 Ayes