Loading...
HomeMy WebLinkAboutgr00090_000002_pg06161 Motion by Achterkirch, seconded by Christensen to approve the Planning Commission's recommendation to allow Mr. Parson, 7855 Greenwood Drive to divide his lot into two lots 82.5'. Motion carried unanimously. After a discussion with Mr. Comstock, and. Mr. Meyers concerning a contract with the ' Village Engineer for the sanitary sewer survey it was decided to hold a special meeting Mon- day, April 13th at the Mayor's residence. The Deputy Clerk to inform Council members of the meeting. The Mayor, Trustee Sullivan and Engineer Comstock to meet at 1:30 P.M., Saturday afternoon, April llth to discuss the grading of playgrounds in the area. Trustee Sullivan reported that the Recreation Commission had obtained information that playgrounds in the area which require grading could be graded to the correct levels for less than $1,000.00. He also reported that some members of the Recreation Commission had made visual inspections of property south of Highway 10 to determine if desirable property is available to develop into park areas. He also stated that a member of the Recreation Commission had contributed some used lumber which could be used to build bleachers, player benches, etc. on the village playgrounds. Trustee Sullivan presented the following budget to the Council for the summer program at Lakeside Park: Sr. Water Instructor $600.00 Jr. Water Instructor 450.00 Lifeguard 300.00 Lifeguard 650.00 2,000.00 Total Personnel Maintenance of beach 300.00 Lights 250.00 Maintenance of ball field 150.00 Materials 100.00 Well platform 25.00 Picnic tables 100.00 Boat 25.00 Swings 40.00 Grading 200.00 Water treating 60.00 3,250.00 Total Budget Expected Income Suburban Recreation $600.00 they will pay for the Sr. Water Registration of instruction 500.00 Instructor Ball Team 150.00 Village of Mounds View 1000.00 Village of Spring Lake Park 1000.00 3,250.00 Motion by Christensen, seconded by Gibson to give tentative approval to the Lakeside Park budget as presented by Trustee Sullivan subject to the outcome of the meeting between the two villages. Motion carried unanimously. A suggestion was received from the floor that the Lakeside Park Commission investigate and have the faulty pump at Spring Lake repaired which is necessary to raise the level of the water for a summer beach program. Mayor Gibson stated he would get in touch with County Commissioners to see if they would get the pump at Spring Lake started.